A building team that included the construction and development firm Skanska USA Building has completed Petrocelli Surgical Pavilion at North Shore University Hospital in Manhasset, N.Y.
North Shore is affiliated with Northwell Health, the largest healthcare provider in New York State, which invested $560 million to build the 288,000-sf pavilion tower that features 18 operating rooms (three of which are hybrid rooms with advanced imaging), and 132 intensive care rooms. This project upgrades and expands the hospital’s critical care capabilities; patients will relocate to the new critical care units, and surgeries are scheduled to begin there later this month.
The pavilion will also be new home to the Sandra Atlas Bass Heart Hospital (which had been in the existing facility), and feature a concierge entrance for cardiac patients and their families. (North Shore University Hospital delivered more cardiac care than any other healthcare system in New York State in 2022, with 660,000 ambulatory visits, 38,000 inpatient discharges, 8,700 coronary interventions, 3,900 thoracic surgeries, 3,300 cardiac surgeries, and 2,800 cardiac ablations.)
The new eight-story pavilion should also enhance the hospital’s robust heart, liver, and lung transplant programs, as well as Northwell’s academic neurosurgery department, one of the largest in the nation. The pavilion is projected to perform 2,000 of the department’s annual cases.
Project took nearly four years to complete
Skanska USA broke ground on the Petrocelli Surgical Pavilion in April 2020. The firm deployed numerous construction technologies, including drones equipped with high-res cameras and sensors to track construction progress and site conditions. Progress with also assessed using 3D modeling and weekly 360-degree image and video capture.
“The state-of-the-art Petrocelli Surgical Pavilion will significantly augment Northwell’s ability to provide its top-ranked care to patients on Long Island,” said Sean Szatkowski, Executive Vice President and General Manager for Skanska USA Building, in a prepared statement.
CannonDesign provided architectural services for the Pavilion project. Thornton Tomasetti was the structural engineer, BR+A Consulting Engineers the MEP engineer, and Vanasse Hangen Brustlin (VHB) the civil engineer.
Related Stories
Healthcare Facilities | Feb 21, 2023
Cleveland's Glick Center hospital anchors neighborhood revitalization
The newly opened MetroHealth Glick Center in Cleveland, a replacement acute care hospital for MetroHealth, is the centerpiece of a neighborhood revitalization. The eleven-story structure is located within a ‘hospital-in-a-park’ setting that will provide a bucolic space to the community where public green space is lacking. It will connect patients, visitors, and staff to the emotional and physical benefits of nature.
Multifamily Housing | Feb 16, 2023
Coastal Construction Group establishes an attainable multifamily housing division
Coastal Construction Group, one of the largest privately held construction companies in the Southeast, has announced a new division within their multifamily sector that will focus on the need for attainable housing in South Florida.
Intelligent Lighting | Feb 13, 2023
Exploring intelligent lighting usage in healthcare, commercial facilities
SSR's Todd Herrmann, PE, LEEP AP, explains intelligent lighting's potential use cases in healthcare facilities and more.
Giants 400 | Feb 9, 2023
New Giants 400 download: Get the complete at-a-glance 2022 Giants 400 rankings in Excel
See how your architecture, engineering, or construction firm stacks up against the nation's AEC Giants. For more than 45 years, the editors of Building Design+Construction have surveyed the largest AEC firms in the U.S./Canada to create the annual Giants 400 report. This year, a record 519 firms participated in the Giants 400 report. The final report includes 137 rankings across 25 building sectors and specialty categories.
Giants 400 | Feb 6, 2023
2022 Reconstruction Sector Giants: Top architecture, engineering, and construction firms in the U.S. building reconstruction and renovation sector
Gensler, Stantec, IPS, Alfa Tech, STO Building Group, and Turner Construction top BD+C's rankings of the nation's largest reconstruction sector architecture, engineering, and construction firms, as reported in the 2022 Giants 400 Report.
Healthcare Facilities | Jan 31, 2023
How to solve humidity issues in hospitals and healthcare facilities
Humidity control is one of the top mechanical issues healthcare clients face. SSR's Lee Nordholm, PE, LEED AP, offers tips for handling humidity issues in hospitals and healthcare facilities.
Augmented Reality | Jan 27, 2023
Enhancing our M.O.O.D. through augmented reality therapy rooms
Perkins Eastman’s M.O.O.D. Space aims to make mental healthcare more accessible—and mental health more achievable.
Hospital Design Trends | Jan 19, 2023
Maximizing access for everyone: A closer look at universal design in healthcare facilities
Maria Sanchez, Interior Designer at Gresham Smith, shares how universal design bolsters empathy and equity in healthcare facilities.
Fire and Life Safety | Jan 9, 2023
Why lithium-ion batteries pose fire safety concerns for buildings
Lithium-ion batteries have become the dominant technology in phones, laptops, scooters, electric bikes, electric vehicles, and large-scale battery energy storage facilities. Here’s what you need to know about the fire safety concerns they pose for building owners and occupants.
Healthcare Facilities | Dec 20, 2022
4 triage design innovations for shorter wait times
Perkins and Will shares a nurse's insights on triage design, and how to help emergency departments make the most of their resources.