A building team that included the construction and development firm Skanska USA Building has completed Petrocelli Surgical Pavilion at North Shore University Hospital in Manhasset, N.Y.
North Shore is affiliated with Northwell Health, the largest healthcare provider in New York State, which invested $560 million to build the 288,000-sf pavilion tower that features 18 operating rooms (three of which are hybrid rooms with advanced imaging), and 132 intensive care rooms. This project upgrades and expands the hospital’s critical care capabilities; patients will relocate to the new critical care units, and surgeries are scheduled to begin there later this month.
The pavilion will also be new home to the Sandra Atlas Bass Heart Hospital (which had been in the existing facility), and feature a concierge entrance for cardiac patients and their families. (North Shore University Hospital delivered more cardiac care than any other healthcare system in New York State in 2022, with 660,000 ambulatory visits, 38,000 inpatient discharges, 8,700 coronary interventions, 3,900 thoracic surgeries, 3,300 cardiac surgeries, and 2,800 cardiac ablations.)
The new eight-story pavilion should also enhance the hospital’s robust heart, liver, and lung transplant programs, as well as Northwell’s academic neurosurgery department, one of the largest in the nation. The pavilion is projected to perform 2,000 of the department’s annual cases.
Project took nearly four years to complete
Skanska USA broke ground on the Petrocelli Surgical Pavilion in April 2020. The firm deployed numerous construction technologies, including drones equipped with high-res cameras and sensors to track construction progress and site conditions. Progress with also assessed using 3D modeling and weekly 360-degree image and video capture.
“The state-of-the-art Petrocelli Surgical Pavilion will significantly augment Northwell’s ability to provide its top-ranked care to patients on Long Island,” said Sean Szatkowski, Executive Vice President and General Manager for Skanska USA Building, in a prepared statement.
CannonDesign provided architectural services for the Pavilion project. Thornton Tomasetti was the structural engineer, BR+A Consulting Engineers the MEP engineer, and Vanasse Hangen Brustlin (VHB) the civil engineer.
Related Stories
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 7, 2014
Ranked: Top state government sector AEC firms [2014 Giants 300 Report]
PCL Construction, Stantec, and AECOM head BD+C's rankings of the nation's largest state government design and construction firms, as reported in the 2014 Giants 300 Report.
| Sep 7, 2014
Hybrid healthcare: Revamping inefficient inpatient units to revenue-producing outpatient care
It's happening at community hospitals all over America: leadership teams are looking for ways to maintain margins by managing underutilized and non-revenue producing space. GS&P's David Magner explores nontraditional healthcare models.
| Sep 7, 2014
Behind the scenes of integrated project delivery — successful tools and applications
The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.
| Sep 4, 2014
Hospital CEOs, architects sound off on state of healthcare design
Healthcare construction will continue to feel the effects of radical changes in the delivery of care, according to healthcare leaders attending the annual Summer Leadership Summit of the American College of Healthcare Architects and the AIA Academy of Architecture for Health.
| Sep 3, 2014
Ranked: Top local government sector AEC firms [2014 Giants 300 Report]
STV, HOK, and Turner top BD+C's rankings of the nation's largest local government design and construction firms, as reported in the 2014 Giants 300 Report.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Sep 1, 2014
Ranked: Top federal government sector AEC firms [2014 Giants 300 Report]
Clark Group, Fluor, and HOK top BD+C's rankings of the nation's largest federal government design and construction firms, as reported in the 2014 Giants 300 Report.
| Aug 26, 2014
6 lessons from a true IPD project: George Washington University Hospital
In its latest blog post, Skanska shares tips and takeaways from the firm's second true integrated project delivery project.