A building team that included the construction and development firm Skanska USA Building has completed Petrocelli Surgical Pavilion at North Shore University Hospital in Manhasset, N.Y.
North Shore is affiliated with Northwell Health, the largest healthcare provider in New York State, which invested $560 million to build the 288,000-sf pavilion tower that features 18 operating rooms (three of which are hybrid rooms with advanced imaging), and 132 intensive care rooms. This project upgrades and expands the hospital’s critical care capabilities; patients will relocate to the new critical care units, and surgeries are scheduled to begin there later this month.
The pavilion will also be new home to the Sandra Atlas Bass Heart Hospital (which had been in the existing facility), and feature a concierge entrance for cardiac patients and their families. (North Shore University Hospital delivered more cardiac care than any other healthcare system in New York State in 2022, with 660,000 ambulatory visits, 38,000 inpatient discharges, 8,700 coronary interventions, 3,900 thoracic surgeries, 3,300 cardiac surgeries, and 2,800 cardiac ablations.)
The new eight-story pavilion should also enhance the hospital’s robust heart, liver, and lung transplant programs, as well as Northwell’s academic neurosurgery department, one of the largest in the nation. The pavilion is projected to perform 2,000 of the department’s annual cases.
Project took nearly four years to complete
Skanska USA broke ground on the Petrocelli Surgical Pavilion in April 2020. The firm deployed numerous construction technologies, including drones equipped with high-res cameras and sensors to track construction progress and site conditions. Progress with also assessed using 3D modeling and weekly 360-degree image and video capture.
“The state-of-the-art Petrocelli Surgical Pavilion will significantly augment Northwell’s ability to provide its top-ranked care to patients on Long Island,” said Sean Szatkowski, Executive Vice President and General Manager for Skanska USA Building, in a prepared statement.
CannonDesign provided architectural services for the Pavilion project. Thornton Tomasetti was the structural engineer, BR+A Consulting Engineers the MEP engineer, and Vanasse Hangen Brustlin (VHB) the civil engineer.
Related Stories
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 20, 2012
Forrester begins construction of freestanding cancer center in Montgomery County, Md.
The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.
| Sep 7, 2012
Healthcare architects get a preview of tomorrow’s medical landscape
The topic on everyone’s mind was how the Affordable Care Act would impact healthcare design and construction––and whether the law would even make it past the coming election cycle.
| Sep 7, 2012
Lucile Packard Children’s Hospital breaks ground on expansion
Sustainability and nature at the heart of the new addition at the Stanford University Medical Center designed by Perkins+Will.
| Sep 6, 2012
CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building
The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 24, 2012
KLMK Group forms strategic alliance with Taylor Construction Management
KLMK's expertise in the capital delivery process and TCM's global platform combine to provide an integrated solution with an unparalleled impact for health care related industries.
| Aug 24, 2012
Study predicts how health economic, delivery and buildings play a role in the next decade
Study also finds accountable care organizations, pay-for-performance and aging population will have greatest impact over next five years.
| Aug 9, 2012
DSGW Architects welcomes new employees
Three new employees located in DSGW's Duluth office.
| Aug 7, 2012
McCarthy tops out LEED Platinum-designed UCSD Health Sciences Biomedical Research Facility
New laboratory will enable UCSD to recruit and accommodate preeminent faculty.