flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New tool helps developers, contractors identify geographic risk for construction

New tool helps developers, contractors identify geographic risk for construction

Interactive tool from Aon Risk Solutions points out potential legal, insurance, and catastrophic exposure roadblocks


By John Caulfield, Senior Editor | November 18, 2014
An example of Aons Construction Risk Map, which the portal updates regularly to
An example of Aons Construction Risk Map, which the portal updates regularly to provide clients with insights into where the bu

Developers and contractors entering new markets that are looking to mitigate their projects’ risk now have available an interactive tool that not only allows them to access real-time updates pertaining to the risk climate of municipalities across the U.S., but also to create a job-specific risk profile that takes into account such factors as local statutes and the potential for catastrophic exposure.

Aon Risk Solutions, through its Construction Services Group, has gone live with its Construction Risk Portal, a web-enhanced tool that helps clients navigate risk when working across multiple geographies simultaneously.

Aon Risk Solutions is a division of London-based Aon plc, a publicly traded global provider of risk management, insurance and reinsurance brokerage, and human resources solutions and outsourcing services. It has clients in 120 countries.

The portal is a single website with two applications:

• Construction Risk Map is a searchable reference library. It provides a macroeconomic vantage of the construction risk climate across the country, and outlines specific issues—such as litigation, legislation, and insurance requirements—that contribute to overall construction’s risk rating;

• Construction Risk Register is an interactive module through which users can create project- and location-specific risk profiles based on data about the project. The profile would have three components: State-specific statutes and case law based on construction-specific issues as tracked in the Construction Risk Map; a map that plots a project’s location based on information input and through a partnership with Aon Benfield’s Impact Forecasting capabilities and analysis of catastrophic exposure; and a risk “matrix” that plots the potential severity of jurisdictional issues and catastrophic exposures on a construction project.

Aon Risk Solutions developed this interactive platform with assistance from Johnson & Bell, a real estate and construction litigation firm, and one of several information partners with which Aon has on retainer. 

“The Construction Risk Portal will allow our clients and colleagues to have access 24-hours a day, seven days a week to statutory developments, case law, risk trends and regulatory updates,” says Matt Walsh, Executive Vice President and Chief Broking Officer of Aon Risk Solutions’ Construction Services Group. 

Aon now includes access to this portal as one of the services it offers to clients, says Walsh. The plan is to add other applications in 2015, which Walsh says could revolve around safety drivers, contractual issues, and information about risks in other countries, such as Canada. 

Related Stories

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

| Sep 14, 2011

Thornton Tomasetti’s Poon named to the Council on Tall Buildings and Urban Habitat’s Board of Trustees

 During his 30-plus years of experience, Poon has been responsible for the design and construction of super high-rise structures, mixed-used buildings, hotels, airports, arenas and residential buildings worldwide. 

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 9, 2011

Kauffman Center for the Performing Arts in Kansas City opens this month

Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 8, 2011

Two promoted at ajc architects

ajc architects announced the promotion of Joshua W. Greene, AIA, NCARB, LEED Green Associate to Associate Principal of the firm. The firm also announced that Kent Rigby, AIA, has been promoted to Associate Architect.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021