Developers and contractors entering new markets that are looking to mitigate their projects’ risk now have available an interactive tool that not only allows them to access real-time updates pertaining to the risk climate of municipalities across the U.S., but also to create a job-specific risk profile that takes into account such factors as local statutes and the potential for catastrophic exposure.
Aon Risk Solutions, through its Construction Services Group, has gone live with its Construction Risk Portal, a web-enhanced tool that helps clients navigate risk when working across multiple geographies simultaneously.
Aon Risk Solutions is a division of London-based Aon plc, a publicly traded global provider of risk management, insurance and reinsurance brokerage, and human resources solutions and outsourcing services. It has clients in 120 countries.
The portal is a single website with two applications:
• Construction Risk Map is a searchable reference library. It provides a macroeconomic vantage of the construction risk climate across the country, and outlines specific issues—such as litigation, legislation, and insurance requirements—that contribute to overall construction’s risk rating;
• Construction Risk Register is an interactive module through which users can create project- and location-specific risk profiles based on data about the project. The profile would have three components: State-specific statutes and case law based on construction-specific issues as tracked in the Construction Risk Map; a map that plots a project’s location based on information input and through a partnership with Aon Benfield’s Impact Forecasting capabilities and analysis of catastrophic exposure; and a risk “matrix” that plots the potential severity of jurisdictional issues and catastrophic exposures on a construction project.
Aon Risk Solutions developed this interactive platform with assistance from Johnson & Bell, a real estate and construction litigation firm, and one of several information partners with which Aon has on retainer.
“The Construction Risk Portal will allow our clients and colleagues to have access 24-hours a day, seven days a week to statutory developments, case law, risk trends and regulatory updates,” says Matt Walsh, Executive Vice President and Chief Broking Officer of Aon Risk Solutions’ Construction Services Group.
Aon now includes access to this portal as one of the services it offers to clients, says Walsh. The plan is to add other applications in 2015, which Walsh says could revolve around safety drivers, contractual issues, and information about risks in other countries, such as Canada.
Related Stories
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.