flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New windows and doors revitalize older buildings

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.


By By Sue Bady, Contributing Editor | March 30, 2012
For the renovation of Mitchell Hall at the University of New Mexico (designed by
For the renovation of Mitchell Hall at the University of New Mexico (designed by Pueblo Revival style advocate John Gaw Meem), t
This article first appeared in the April 2012 issue of BD+C.

When selecting replacement windows and doors for retrofits, Building Teams must consider aesthetics, cost, schedule, view, energy performance, accessibility, and durability. Then there are environmental and security considerations, such as vandal resistance, blast-hazard mitigation, and hurricane-impact protection. Fortunately, new technologies are making it easier to meet those requirements and upgrade the appearance and energy efficiency of a building, while keeping the project on budget.

Compared to the products available 15 years ago, new windows and doors offer greatly improved thermal performance, says John Bendt, sales/marketing vice president with Wausau Window and Wall Systems (www.wausauwindow.com). “That’s because better thermal separators, such as glass-reinforced nylon, provide superior insulation through increased aluminum separation and air space in the frames,” says Bendt.

Fabricated glass continues to improve in insulating value and controlling solar heat gain while letting an appropriate amount of natural light into the building. Triple-insulating glass is also being considered for more projects. “The biggest trend today is toward energy-efficient technologies, including aluminum-clad wood, fiberglass and vinyl frames, and high-performance, low-e glass,” says Terry Zeimetz, commercial marketing manager for Pella Corp. (www.pella.com).

“Aluminum cladding has come a long way in its ability to emulate wood profiles,” notes Jeff Hoffman, an architectural sales representative for Marvin Windows and Doors (http://commercial.marvin.com)

Older windows can be swapped out for new ones that offer similar sightlines and historical look. For example, aluminum-framed, projected windows can be made to look like old steel windows or double-hung windows but are easier to operate, says Bendt. Aluminum cladding is frequently used in historically influenced replacement windows because it’s durable and easy to customize. Factory-applied anodized and baked-on fluoropolymer paint finishes can be formulated to match existing color schemes or reproduce a building’s original colors. Such finishes are also eco-friendly.

Commercial doors can be specified with components and technologies to address constantly increasing thermal performance requirements. “Many types of high-performance glass, including those that withstand blasts and hurricane impact, can be incorporated without altering the overall look of a door,” says Mary Olivier, marketing manager for Tubelite Inc. (www.tubeliteinc.com), a manufacturer of architectural aluminum window, entrance storefront, and curtain wall systems.

Durability is a key factor in selecting a door/hardware combination and the size of the stiles (the vertical members of the door frame). But the most significant task in replacement projects, particularly for historic buildings, is to match the work of historic artisans using modern materials on a limited budget, Olivier says.

Deciding whether or not to use the existing window and door framing in a retrofit depends on such factors as the presence of wood rot and hazardous materials, the structural integrity of the existing frame, and the anchorage scheme of the replacement system, says Ken Brenden, CDT, of the American Architectural Manufacturers Association (www.aamanet.org), Schaumburg, Ill.

Bendt points out that older window frames don’t offer modern-day thermal technology and performance, so it’s worthwhile to evaluate new frames for their potential energy savings and reduced maintenance. Ultimately, the decision to keep or tear out existing framing should be based on energy modeling and budgeting information, he says.

Let’s take a look at a few instructive window/door retrofits.

[pagebreak]

UNIVERSITY RESIDENCE HALL UPGRADE: SAVE ENERGY, IMPROVE AESTHETICS

Eastern Michigan University, Ypsilanti, Mich., completed a $3.1 window renovation last year on its First-Year Center, a freshman residential hall that dates back to the 1960s. More than 675 operable, high-performance windows were installed.

Energy conservation and improved aesthetics were the primary goals, says architect Sandra Laux, AIA, of Detroit-based Hamilton Anderson Associates (www.hamilton-anderson.com). To replace the single-pane glazed windows with insulated units, Laux selected Wausau low-profile windows. Their aluminum frames have a copper anodized finish to contrast with the blond brick exterior. The low-maintenance, durable finish is expected to maintain its color over time without forming a patina.

The renovation also included replacement of the exterior doors and curtain wall system. “The stair towers had single-glazed curtain wall from the 1960s, which was failing,” says Hamilton Anderson’s Michael Decoster.

Decoster specified EFCO curtain wall and storefront framing systems for the stair towers and entry canopy. The existing concrete canopy rested on small steel columns and was “a really heavy mass” hanging over the entry. “We took that all off the structure and reclad the canopy in curtain wall framing, so on each side of the entry are two-foot-tall pieces of glass that are structurally glazed,” he says. The frosted glass is backlit at night.

OREGON STATE HOSPITAL: RESPECT FOR HISTORY

In 2008, the Oregon State Hospital (OSH) campus, in Salem, was granted national historic landmark status. A complete structural renovation wasn’t an option, but J Building, an 1883-vintage four-story structure designed in the Kirkbride style of psychiatric facilities—and made famous as the setting of the film “One Flew Over the Cuckoo’s Nest”—was restored and refurbished.

To bring the building up to 21st-century standards and seismic requirements, workers removed asbestos and lead paint, added steel rebar, layers of sprayed concrete, and new wood beams, and restored the original cupola.

But the grandest undertaking was the replacement of more than 500 windows on the street side of the building. “It was important to preserve as many historic features as possible,” says Patricia Feeny, communications manager for the OSH Replacement Project. “At the same time, we had to meet state-mandated energy and safety requirements.”

Wausau fabricated windows with sash muntins to match the originals in material and design. The psychiatric-grade windows were drop-tested for interior human impacts of up to 2,000 foot-pounds of energy. The aluminum frames have a resin-based coating that resists humidity, color change, chalking, gloss loss, and chemicals.

5 TIPS for a successful door and window retrofit

1. Analyze products on a level playing field using American Architectural Manufacturers Association and National Fenestration Rating Council (www.nfrc.org) standards and test sites. As you’re calculating ROI, be sure to factor in the savings that may come from being able to downsize the HVAC system, cut repair and maintenance costs, and trim energy costs due to better insulating value and more natural light.

2. Work with the manufacturer’s local architectural representative in the early stages of the project. Trained reps can help with site inspection, drawings, field measurements and testing, energy modeling, mockups, budgeting, detail support, and specification support.

3. Take advantage of AAMA publications on door and window selection criteria, design considerations, window and exterior door types, performance requirements and testing, and accessory items and special features: http://www.aamanet.org/general/1/45/publication-store.

4. Select an installer who will ensure a safe, hassle-free installation while minimizing disruptions to building occupants.  Your manufacturer can assist you in finding the right installer.

5. Use moderate door heights and widths, especially when using insulated or specialty glass. Large entrances also have increased size and weight, which places additional strain on hinging hardware and can shorten the door’s longevity.

MITCHELL HALL AT UNM: HOMAGE TO THE PAST

Mitchell Hall, one of the oldest classroom buildings at the University of New Mexico, was built in 1954. While not a registered historic landmark, the building is noteworthy for its design by John Gaw Meem IV (1894-1983), one of the Southwest’s most influential architects.

In tackling the renovation, Albuquerque-based Hartman + Majewski Design Group (designgroupnm.com) sought to preserve the building’s historic integrity while improving its environmental sustainability. The original single-pane, steel-framed windows had narrow sightlines and were stacked vertically with one-inch widths between glazings.

“Part of the goal was to maintain the exterior feel of the project so that the university could, in the future, pursue putting [the building] on the historic registry,” says principal architect Jeff Zellner, AIA, NCARB, LEED AP BD+C.

Hartman + Majewski analyzed the existing window systems and performed energy modeling as part of the LEED certification process. “We looked at improvements that would give us the biggest bang for the buck,” says Zellner.

The team considered a number of options, including true historic steel windows, storefront framing, and aluminum, but ultimately chose Pella fiberglass windows. “We were not familiar with fiberglass windows in commercial applications, but Pella did a pretty good sell on the performance characteristics as well as maintenance,” he says.

With the combined benefit of the new windows, a more efficient mechanical system, and enhanced lighting controls, Mitchell Hall is expected to earn LEED Silver.

THE ST. LOUIS ZOO: REPURPOSING THE ELEPHANT HOUSE

Peabody Hall, the oldest building at the St. Louis Zoo, was completed in 1917. The Renaissance Revival structure, designed by architect George Barnett, served for eight decades as the Elephant House. In 2009, Peabody Hall was renovated to house temporary exhibits in celebration of the zoo’s 100th anniversary. The project was a joint venture of two St. Louis-based design firms, Ottolino Winters Huebner (www.owh-inc.com) and the JCO LLC (www.thejco.com).

According to OWH, the original Elephant House’s masonry, stone, and terra cotta exterior had held up quite nicely over 95-plus years, but the windows and doors were well past their usable life—especially the ornate quatrefoil window in the attic. Finding durable, easy-to-use replacement products that allowed the necessary customization to replicate the form and appearance of the originals became the challenge.

Marvin Windows and Doors fabricated five large transoms, two sets of stationary awning windows, and seven commercial doors (three operating, four fixed) for the renovation. All windows and doors were glazed with black spandrel insulating glass that emulates the look of field-painted glass. To replicate the quatrefoil window, Marvin used five pieces of glass, with true divided lites in the rectangular center section and simulated divided lites surrounding the rectangle. +

Related Stories

| Feb 10, 2011

Zero Energy Buildings: When Do They Pay Off in a Hot and Humid Climate?

There’s lots of talk about zero energy as the next big milestone in green building. Realistically, how close are we to this ambitious goal? At this point, the strategies required to get to zero energy are relatively expensive. Only a few buildings, most of them 6,000 sf or less, mostly located in California and similar moderate climates, have hit the mark. What about larger buildings, commercial buildings, more problematic climates? Given the constraints of current technology and the comfort demands of building users, is zero energy a worthwhile investment for buildings in, for example, a warm, humid climate?

| Feb 9, 2011

Hospital Construction in the Age of Obamacare

The recession has hurt even the usually vibrant healthcare segment. Nearly three out of four hospital systems have put the brakes on capital projects.  We asked five capital expenditure insiders for their advice on how Building Teams can still succeed in this highly competitive sector.

| Feb 9, 2011

Businesses make bigger, bolder sustainability commitments

In 2010, U.S. corporations continued to enhance their sustainable business efforts by making bigger, bolder, longer-term sustainability commitments. GreenBiz issued its 4th annual State of Green Business report, a free downloadable report that measures the progress of U.S. business and the economy from an environmental perspective, and highlights key trends in corporate culture in regard to the environment.

| Feb 8, 2011

AIA names 104 members to College of Fellows

The Fellowship program was developed to elevate those architects who have made a significant contribution to architecture and society and who have achieved a standard of excellence in the profession. Election to fellowship not only recognizes the achievements of architects as individuals, but also their significant contribution to architecture and society on a national level.

| Feb 4, 2011

President Obama: 20% improvement in energy efficiency will save $40 billion

President Obama’s Better Buildings Initiative, announced February 3, 2011, aims to achieve a 20% improvement in energy efficiency in commercial buildings by 2020, improvements that will save American businesses $40 billion a year.

| Jan 31, 2011

Cuningham Group Architecture launches Healthcare studio with Lee Brennan

International design firm Cuningham Group Architecture, P.A. (Cuningham Group) has announced the arrival of Lee Brennan, AIA, as Principal and Leader of its new Healthcare studio. Brennan comes to Cuningham Group with over 30 years of professional experience, 22 of those years in healthcare, encompassing all aspects of project delivery, from strategic planning and programming through design and construction. The firm’s new Healthcare studio will enhance Cuningham Group’s expertise in leisure and entertainment, education, mixed-use/housing and workplace environments.

| Jan 31, 2011

HDR Architecture Releases Evidence-based Design Videos

As a follow-up to its book Evidence-based Design for Healthcare Facilities, HDR Architecture, Inc. has released three video case studies that highlight evidence-based design principles in action.

| Jan 31, 2011

CISCA releases White Paper on Acoustics in Healthcare Environments

The Ceilings & Interior Systems Construction Association (CISCA) has released an extensive white paper “Acoustics in Healthcare Environments” for architects, interior designers, and other design professionals who work to improve healthcare settings for all users. This white paper serves as a comprehensive introduction to the acoustical issues commonly confronted on healthcare projects and howbest to address those.

| Jan 28, 2011

Firestone Building Products Unveils FirestoneRoof Mobile Web App

Firestone Building Products Company unveiled FirestoneRoof, a first-of-its-kind free mobile web app. The FirestoneRoof mobile web app enables customers to instantly connect with Firestone commercial roofing experts and is designed to make it easier for building owners, facility managers, roofing consultants and others charged with maintaining commercial roofing systems to get the support they need, when they need it.

| Jan 27, 2011

Perkins Eastman's report on senior housing signals a changing market

Top international design and architecture firm Perkins Eastman is pleased to announce that the Perkins Eastman Research Collaborative recently completed the “Design for Aging Review 10 Insights and Innovations: The State of Senior Housing” study for the American Institute of Architects (AIA). The results of the comprehensive study reflect the changing demands and emerging concepts that are re-shaping today’s senior living industry.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021