flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City code update changes definition of a major building

Codes and Standards

New York City code update changes definition of a major building

Impacts how construction projects are permitted with major implications for contractors


By Peter Fabris, Contributing Editor | July 15, 2024
Image by Melissa Mahon from Pixabay

Image by Melissa Mahon from Pixabay

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors.

On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

It will require a site safety coordinator and an approved site safety plan for any major new build, full demolition, or interior demolition with mechanical equipment that is seven stories or higher. Contractors working on these major projects should hire professionals to assist them with navigating through the entire application, permit, certificate of occupancy, approval, and sign-off processes, advises a former New York Department of Buildings assistant commissioner. Contractors who have previously built only low-rise buildings should also hire a safety consultant to provide full-time safety professionals and obtain approvals for site safety plans and tenant protection plans, he says.

The code change includes a provision for construction superintendents to only be designated on three permits at one time. In January 2026, this number will be reduced to one permit. As a result, contractors should send their staff to obtain superintendent licenses and Supervisory SST training cards.

Related Stories

Concrete | Jun 13, 2016

American Concrete Institute releases new Guide to Shotcrete

Includes information on application procedures, testing.  

Healthcare Facilities | Jun 10, 2016

Top 10 health technology hazards include some influenced by space design

ECRI Institute’s annual list includes operational and workflow issues.  

Codes and Standards | Jun 9, 2016

Supreme Court ruling could aid developers on properties containing wetlands

Unanimous decision allows landowners to take regulatory decisions straight to court.

Green | Jun 8, 2016

TD Bank Group's renovated Toronto office is first WELL-Certified project under WELL v1

The newly renovated 25,000-sf space achieved gold-level status.

Concrete | Jun 7, 2016

Concrete Institute publishes document providing concrete curing guidance

New curing monitoring techniques included.  

Energy | Jun 7, 2016

Energy modeling payback typically as short as one to two months

Energy modeling is a ‘no-brainer—like checking MPG on a car’

Green | Jun 2, 2016

USGBC offers new LEED pilot credit: Building Material Human Hazard and Exposure Assessment

For assessing human health-related exposure scenarios for construction products.

Resiliency | Jun 1, 2016

Federal agencies boost standards for more resilient construction

HUD, FEMA, GSA, Army Corps of Engineers make policy changes.    

Green | May 31, 2016

Miami Beach requires developers to meet green standards or pay a fee

Applies to structures larger than 7,000 sf.  

Codes and Standards | May 27, 2016

Better enforcement needed for successful implementation of energy efficiency policies

Commercial buildings the focus of recent code initiatives.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021