flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New York City preparing new codes for evacuation elevators

Codes and Standards

New York City preparing new codes for evacuation elevators

Evacuation philosophy for skyscrapers is changing


By Peter Fabris, Contributing Editor | April 14, 2015
New York City preparing new codes for evacuation elevators

Rookery Building, Chicago. Photo: Velvet via Wikimedia Commons

New York City’s Fire, Buildings, and City Planning Departments in New York are writing rules to govern occupant-evacuation elevators, reflecting a change in philosophy of how to evacuate people from skyscrapers in an emergency.

The evacuation elevator cars can be used to move people down in an emergency in special circumstances. This is a dramatic change from decades of codes and practices based on the notion that elevators are perilous and undependable in fires or other emergencies.

That approach has become outmoded and is potentially dangerous for the extremely tall skyscrapers increasingly marking the New York skyline, city officials now believe. New York’s regulations now include the “third stair” in commercial towers higher than 420 feet. Builders of new high-rises must provide one more means of emergency exiting than the typical two stairways.

The City Planning Commission approved a measure that would allow developers to satisfy this requirement by providing an extra stairway (which would not be counted against the square footage they are allowed to build), by providing wider stairways and some occupant-evacuation elevators, or by making all elevators comply with occupant-evacuation standards. 

Related Stories

| Jul 16, 2014

Massive $6.5 billion Silicon Valley development gets key city approval

The Santa Clara (Calif.) City Council approved the next steps for a massive development project next to Levi’s Stadium, the new home of the San Francisco 49ers.

| Jul 11, 2014

California Supreme Court rules that architects can be sued by condo association

The decision held that even though, on most projects, the developer has the final say on design choices, the architect can’t escape liability to the end user. 

| Jul 10, 2014

Latest construction accident fatality statistics reverse trend of declining deaths

The latest data on construction site fatalities for 2012 shows a rise in the death rate to 9.9 per 100,000 workers after 2011 had reached a recent low of 9.1 per 100,000, according to an analysis of data by the AFL-CIO.

| Jul 10, 2014

EPA seeking public comments on site contamination rules

The Environmental Protection Agency (EPA) is accepting public comment on its proposal to eliminate the dual standard for compliance with rules pertaining to testing of land that may have been contaminated by chemical pollution.

| Jul 10, 2014

Southern California city considers new water fee for developers

A persistent drought in Southern California could lead to a water fee for new construction projects in Ventura.

| Jul 1, 2014

$1 billion master planned development in California clears key hurdle

Plans for a new section of the proposed $1 billion La Entrada master-planned community in Coachella, Calif., moved ahead after the developer and city council agreed that the plan would include 500 affordable housing units.

| Jul 1, 2014

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

The U.S. Department of Labor and MDG Design & Construction LLC have reached a settlement over wage violations at the federally-assisted 26-story Grand Street Guild rehab project in New York City’s Lower East Side.

| Jul 1, 2014

GSA, Homeland Security research leads to performance-based design guide

The National Performance Based Design Guide, based on research and development supported by the Science & Technology Directorate of the Department of Homeland Security and the Public Buildings Service of the General Services Administration, is now available.

| Jul 1, 2014

FEMA grant helps fund school theater that will double as tornado safe room

Scott City School District in Missouri recently broke ground on an 8,990-sf performing arts theater that will also function as a tornado safe room.

| Jun 30, 2014

Research finds continued growth of design-build throughout United States

New research findings indicate that for the first time more than half of projects above $10 million are being completed through design-build project delivery. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021