Despite a significant increase to existing building stock in 2022, the national vacancy rate for industrial space in the U.S. fell below 4 percent.
At the end of last November, there were 742.3 million sf of industrial space under construction, representing 4 percent of total existing inventory, according to Commercial Edge’s National Industrial Report, which it released on December 21. Dallas and Phoenix are the two top construction markets for this sector. And nationwide, another 684.5 million sf of industrial space are in their planning stages.
However, new construction is barely keeping up with leasing demand, as the vacancy rate in the 30 largest industrial markets tracked by Commercial Edge stood at 3.8 percent at the end of November. The Report asserts that the biggest challenge for developers is finding suitable land in port markets like California’s Inland Empire, Los Angeles, and New Jersey. But even non-port markets like Nashville and Columbus, Ohio, are experiencing extremely low vacancy rates.
The top 30 markets, through November, recorded aggregate property sales of $78.8 billion. While sales have cooled a bit nationally, the average sales price of $116 per sf in the first two months of the fourth quarter was still nearly 18 percent higher than the same period in 2021.
A huge building for a tight New York market
With these market dynamics as a backdrop, the real estate investment and development firm Turnbridge Equities announced earlier this month the topping out of Bronx Logistics Center, the largest industrial development in New York City.
Nestled in the borough’s Hunts Point industrial area, this Class A 1.3-million-sf, multilevel complex on 14.2 acres (assembled from five properties) consists of 585,000 sf of total warehouse space with 32-ft ceiling heights and 40- by 40-ft column spacing, 730,000 sf of parking space (25 percent of which is electric-vehicle ready with charging stations), 48 loading docks, and 72 drive-in doors.
The building’s rooftop solar panels will generate three megawatts of energy. The site includes a CSX freight railway spur, providing tenants with potential direct rail access, and is located less than two miles from the Hunts Point Food Distribution Center, which generates over $3 billion of annual economic activity.
When it’s completed in the second quarter of 2023, the Bronx Logistics Center will serve the entire New York metropolitan area and beyond. It is a five-minute drive from Manhattan’s Upper West Side, and has convenient access to Interstates 95, 87, 295, and 278.
Arco Design/Build Industrial is the designer and general contractor on this project. “We provided a high level of risk mitigation for our client by locking in construction costs prior to going through all of the design documents,” Arco states on its website. Turnbridge Equities, which owns the building, and the project’s equity partner Dune Real Estate Partners, retained JLL as the leasing agent. (As of mid December, no tenants had committed to leasing space.)
While Turnbridge didn’t release the cost of this project, The Real Deal reported that Turnbridge paid $174 million to acquire the land in 2018 and more recently secured $381 million in construction financing and debt refinancing from KKR.
Once completed, the Bronx Logistics Center’s size will exceed the 1-million-sf industrial development of Innova Property Group and Square Mile Capital Management. The borough’s industrial inventory accounts for about 17 million sf of space. The Bronx Times reports that only 1.6 percent of New York City’s industrial space is available for lease.
Related Stories
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 26, 2014
First look: Lockheed Martin opens Advanced Materials and Thermal Sciences Center in Palo Alto
The facility will host advanced R&D in emerging technology areas like 3D printing, energetics, thermal sciences, and nanotechnology.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Frames: the biggest value engineering tip
In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 7, 2014
Chicago's 7 most threatened buildings: Guyon Hotel, Jeffrey Theater make the list
The 2014 edition of Preservation Chicago's annual Chicago's 7 list includes an L station house, public school, theater, manufacturing district, power house, and hotel.