flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nonresidential building activity on the rise for 2015: AIA Forecast

Nonresidential building activity on the rise for 2015: AIA Forecast

Semiannual Consensus Construction Forecast predicts 4.9% increase this year, 8% next year, with offices and retail facilities leading the charge.


By American Institute of Architects | July 30, 2014
Vikings Stadium construction, April 2014. Photo: Runner1928 via Wikimedia Common
Vikings Stadium construction, April 2014. Photo: Runner1928 via Wikimedia Commons

Due to the weather-related slow start in the nonresidential building market during the first part of the year, and the prolonged weakness in the institutional sector, construction spending projections for the rest of the year have been lowered slightly. 

The commercial construction sector is still looking at solid spending increases throughout the remainder of 2014, paced by high levels of demand for hotels and office buildings. The American Institute of Architects’ (AIA) semi-annual Consensus Construction Forecast, a survey of the nation’s leading construction forecasters, is projecting that spending will see a 4.9% increase in 2014 – down from the previous estimate of 5.8%, with next year’s projection holding at 8%.

VIDEO: AIA Chief Economist discusses economic trends for 3rd quarter of 2014

“The institutional market has been a drag on the overall recovery for the design and construction industry for the last few years, and until we see state and local governments ramp up spending for new education, healthcare and public safety structures there likely won’t be a widespread acceleration in spending for the entire industry,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “But we continue to have an optimistic outlook for the commercial and industrial sectors both for the rest of this year and into 2015.”

 

Market Segment Consensus Growth Forecasts

2014   

2015

 

 

 

Overall nonresidential building

4.9%  

8.0%

 

 

 

Commercial / industrial

9.9%  

11.2%

Hotels

14.5% 

9.2%

Office buildings

12.8% 

13.3%

Industrial facilities

7.6%   

9.2%

Retail

7.4%   

10.4%

 

 

 

Institutional

-0.1% 

5.8%

Amusement / recreation         

3.7%   

6.6%

Education

-0.1%  

5.7%

Healthcare facilities

-1.8%  

6.6%

Religious

-4.1%

0.7%

Public safety

-4.2%

3.3%

 

Baker continued, “While there does not appear to be any structural frailties in the overall economy that could possibly derail increasing levels of construction spending over the next 18 months, lending standards at financial institutions continue to fall well short of the increasing demand for commercial real estate loans, which is another factor that serves as a wild card and a source of concern for the entire industry.”

 

About the AIA Consensus Construction Forecast Panel
The AIA Consensus Construction Forecast Panel is conducted twice a year with the leading nonresidential construction forecasters in the United States including, McGraw Hill Construction, Wells Fargo Securities, IHS-Global Insight, Moody’s economy.com, Reed Business Information, Associated Builders & Contractors and FMI.  The purpose of the Consensus Construction Forecast Panel is to project business conditions in the construction industry over the coming 12 to 18 months.  The Consensus Construction Forecast Panel has been conducted for 15 years.

About The American Institute of Architects
Founded in 1857, members of the American Institute of Architects consistently work to create more valuable, healthy, secure, and sustainable buildings, neighborhoods, and communities. Through nearly 300 state and local chapters, the AIA advocates for public policies that promote economic vitality and public well being.  Members adhere to a code of ethics and conduct to ensure the highest professional standards. The AIA provides members with tools and resources to assist them in their careers and business as well as engaging civic and government leaders, and the public to find solutions to pressing issues facing our communities, institutions, nation and world. Visit www.aia.org.

Related Stories

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.

| Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021