flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NRCA: Roofing insulation performance, local climate keys to computing R-value

NRCA: Roofing insulation performance, local climate keys to computing R-value

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.


By Posted by BD+C Staff | July 19, 2012

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.

The long-term thermal resistance method of determination may generate an R-value required by the building code, but it does not take into account thermal resistance loss when metal fasteners are employed, according to a study.

Click here to learn more. +

Related Stories

Codes and Standards | Jul 23, 2020

North Carolina will stop relying on FEMA flood mapping

State will identify flood zones on its own.

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

Codes and Standards | Jul 15, 2020

Georgia gives the go-ahead for tall mass timber construction

Standards review scheduled to be completed by July 2021.

Codes and Standards | Jul 15, 2020

Softwood-lumber duties boost expenses amid COVID-19 outbreak

Little hope this year for resolution of trade dispute with Canada.

Codes and Standards | Jul 14, 2020

Metal Construction Assn. releases three EPD updates

Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.

Codes and Standards | Jul 13, 2020

5 must reads for the AEC industry today: July 13, 2020

4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021