flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

By the Numbers

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.


By By BD+C Staff | November 11, 2011
6: The number of sides to the Octagon House in Washington D.C., the original home of the AIA.
This article first appeared in the November 2011 issue of BD+C.

171,271
Total of LEED ACCREDITED PROFESSIONALS recognized by the U.S. Green Building Council, as of September 2011.
LEED APs with specialty – 64,060
LEED APs without specialty – 83,985
LEED Green Associates – 23,226
Total LEED Professionals – 171, 271
Source: USGBC

$200.21
The cost per square foot to build a DAYCARE CENTER in San Francisco in 2011, according to RSMeans.
Source: RSMeans

 

1.0
The approximate U-FACTOR (Btu/hr-sf-°F) of currently available aluminum frame windows and doorframes. Also the number of AIA/CES DISCOVERY LEARNING UNITS that can be obtained by studying “High- Performance Windows + Doors” and passing the 10-question exam (80% score required). Source: BD+C

72%
The percentage a GEOTHERMAL HEAT PUMP can reduce energy consumption when compared to conventional HVAC system, according to the EPA. Additionally, the U.S. Department of Energy reported that geothermal heat pumps can but HVAC energy demand by 50% and overall energy demand by 35%. Geothermal heat pumps are expected to gain market share as recent government mandates require newly constructed buildings to be zero net energy. Energy-efficient retrofits will also increase market demand for the pumps. Source: EPA

46.9
The September 2011 AIA ARCHITECTURE BILLINGS INDEX, following a score of 51.4 in August 2011. The monthly ABI index scores are based on a score of 50, with scores above 50 indicating an aggregate increase in billings and scores below 50 indicating a decline. In regard to September’s 46.9 score, “It appears the positive conditions seen last month were more of an aberration,” said AIA Chief Economist Kermit Baker, PhD, Hon. AIA. Source: AIA

420
Buildings taller than 420 feet are now required to include an EXTRA EXIT STAIRWELL OR ELEVATOR that occupants can use for evacuations, according to the National Institute of Standards and Technology. Source: NIST

$886.2
Total put-in-place CONSTRUCTION DOLLARS in billions predicted for 2012, according to the latest FMI forecast, which calls for 2% growth in 2011, and 6% for 2012. In 2012, the construction industry will return a level of construction in current dollars that is comparable to levels recorded in 2003. Source: FMI

83%
The percentage of AIR REDUCTION possible following the installation of an air barrier system in a commercial or industrial building, according to the National Institute of Standards and Technology. The installation of an air barrier can also shrink gas bills by more than 40%, and reduce electrical use by 25%. Source: NIST

$65,000,000
Total funds currently invested in the energy-efficiency financing initiative known as the BILLION DOLLAR GREEN CHALLENGE. The fund aims to get colleges, universities, and other nonprofits to invest $1 billion in self-managed funds to be used to finance energy-efficiency upgrades. Source: BD+C

50,000
Owners of every New York City commercial and residential buildings larger than 50,000 sf will have to post each building’s ENERGY USE ONLINE, starting with commercial buildings in 2012, followed by residential buildings in 2013. Architects and environmentalists believe the measure will prompt owners to invest in cleaner, more sustainable designs. Source: BD+C

6
The number of sides to the Octagon House in Washington D.C., the original home of the AIA. Built between 1978 and 1800, the Octagon House was designed by Dr. William Thornton, the architect of the U.S. Capitol. Adapted to an irregular-shaped lot, the design of the three-story brick house combines a circle, two rectangles, and a triangle, resulting in a six-sided structure. Source: National Park Service
--
Submit your “By the Numbers” item to: Tim Gregorski, Senior Editor, tgregorski@sgcmail.com.
You must include documentation showing the source of your entry. Readers whose items are chosen will receive credit in the magazine and a $10 Amazon gift certificate. Decision of the editors of BD+C is final.

Related Stories

Giants 400 | Aug 30, 2023

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

Building Team | Aug 28, 2023

Navigating challenges in construction administration

Vessel Architecture's Rebekah Schranck, AIA, shares how the demanding task of construction administration can be challenging, but crucial.

Laboratories | Aug 24, 2023

Net-zero carbon science center breaks ground in Canada

Designed by Diamond Schmitt, the new Atlantic Science Enterprise Centre (ASEC) will provide federal scientists and partners with state-of-the-art space and equipment to collaborate on research opportunities.

Multifamily Housing | Aug 24, 2023

A multifamily design for multigenerational living

KTGY’s Family Flat concept showcases the benefits of multigenerational living through a multifamily design lens.

Multifamily Housing | Aug 23, 2023

Constructing multifamily housing buildings to Passive House standards can be done at cost parity

All-electric multi-family Passive House projects can be built at the same cost or close to the same cost as conventionally designed buildings, according to a report by the Passive House Network. The report included a survey of 45 multi-family Passive House buildings in New York and Massachusetts in recent years.

Regulations | Aug 23, 2023

Gas industry drops legal challenge to heat pump requirement in Washington building code

Gas and construction industry groups recently moved to dismiss a lawsuit they had filed to block new Washington state building codes that require heat pumps in new residential and commercial construction. The lawsuit contended that the codes harm the industry groups’ business, interfere with consumer energy choice, and don’t comply with federal law. 

Government Buildings | Aug 23, 2023

White House wants to ‘aggressively’ get federal workers back to the office

The Biden administration wants to “aggressively” get federal workers back in the office by September or October. “We are returning to in-person work because it is critical to the well-being of our teams and will enable us to deliver better results for the American people,” according to an email by White House Chief of Staff Jeff Zients. The administration will not eliminate remote work entirely, though.

Building Owners | Aug 23, 2023

Charles Pankow Foundation releases free project delivery selection tool for building owners, developers, and project teams

Building owners and project teams can use the new Building Owner Assessment Tool (BOAT) to better understand how an owner's decision-making profile impacts outcomes for different project delivery methods.

Transportation & Parking Facilities | Aug 23, 2023

California parking garage features wind-activated moving mural

A massive, colorful, moving mural creatively conceals a newly opened parking garage for a global technology company in Mountain View, Calif.

Giants 400 | Aug 22, 2023

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021