flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office renovation and addition give new life to a section of Huntsville, Ala.

Office Buildings

Office renovation and addition give new life to a section of Huntsville, Ala.

The newly opened Freedom Center, near Redstone Arsenal, includes a 10,000-sf conference center.


By John Caulfield, Senior Editor | March 2, 2017

The Freedom Center in South Huntsville, Ala., is an office complex that is seen as part of the revitalization of that part of the city. Torch Technologies, the building's anchor tenant, spearheaded the redevelopment. Image: J. Hanshaw Photography

In late January, Turner Construction completed the three-phase Freedom Center, a new office complex that is part of the revitalization of South Huntsville, Ala.

The project, designed by Matheny Goldmon Architecture + Interiors and estimated at between $10 million and $12 million, is a multi-tenant facility where its anchor, Torch Technologies, a defense contractor, now operates its corporate headquarters.

Torch’s sister company, Freedom Real Estate and Capital, cleared the path for the steel-framed Freedom Center last year by acquiring two office buildings as well as approximately 12 surrounding acres of land. The Freedom Center is positioning itself to be a hub for business close to Alabama’s Redstone Arsenal.

Torch received a $2.1 million incentive package to stay in Huntsville and redevelop these properties from the city, the state of Alabama, and the Tennessee Valley Authority, according to the Alabama Media Group’s website. It also received tax abatements and grants, and $250,000 from the state as reimbursement for capital expenditures, AIDT-provided workforce training, and the capital income tax credit.

 

 

The schematic of Freedom Center's main level shows what's been upgraded during its three-phase renovation. Image: Courtesy of Freedom Real Estate and Capital

 

The three-phase Freedom Center project included the renovation of a 40,000-sf four-story building at 4090 South Memorial Parkway, which was completed in October 2015. Phase 2 involved the construction of a one-story 12,000-sf building, which connects two existing properties developed by Freedom Real Estate and Capital. This new building features office and training spaces, as well as a 10,000-plus-sf conference center.

Phase 3 replaced the building’s HVAC system, refurbished its lobby and elevators, and replaced the roof on the four-story building a 4035 Chris Drive.

“This is a significant project for Huntsville. Companies like Freedom Real Estate are increasingly investing in the redevelopment of the area,” said Lee Holland, project executive in Turner’s Huntsville office and a native of the city. “We’re thankful to have played a small role in those efforts with the construction and renovations at the Freedom Center.”

Bill Roark, CEO of Torch Technologies & Freedom Real Estate & Capital added that the Freedom Center’s name is meant to honor  “the many military members, as well as civilians, who fight and work every day to keep our country free.”

Other Building Team members on this project included 4 Site Incorporated, PEC Structural Engineering, and SSOE Group.

New Live-Work-Shop complex moving forward

Another major project that appears to have picked up momentum in downtown Huntsville is Constellation, a $180 million live-work-shop complex that would include restaurants and retail, 150 apartments, 280,000 sf of office space, a new hotel, and two parking decks.

This project was first conceived in 2000 but got waylaid during the last recession. But developer Scott McLain, of Coldwell Commercial Real Estate and McLain Real Estate, tells al.com that he has a “firmly established and functioning partnership” for this project, which he claims is now in “full development.”

Groundbreaking for Constellation could take place in a few months, said McLain.

 

Related Stories

| Feb 12, 2013

OMA's 'perimeter core' design wins competition for Essence Financial Building in Shenzhen

OMA partners David Gianotten and Rem Koolhaas rethink traditional office tower design with a plan that shifts the building's core to the edge for large, unobstructed plans.

| Feb 8, 2013

5 factors to consider when designing a shade system

Designing a shade system is more complex than picking out basic white venetian blinds. Here are five elements to consider when designing an interior shade system.

| Feb 6, 2013

RSMeans cost comparisons: office buildings and medical offices

RSMeans' February 2013 Cost Comparison Report breaks down the average construction costs per square foot for four types of office buildings across 25 metro markets.

| Feb 1, 2013

Delinquency rate for U.S. commercial real estate loans hits 11-month low

The delinquency rate for U.S. commercial real estate loans in CMBS fell 14 basis points in January to 9.57%. This is the lowest level in 11 months, according to Trepp, LLC's latest U.S. CMBS Delinquency Report.

| Jan 31, 2013

The Opus Group completes construction of corporate HQ for Church & Dwight Co.

The Opus Group announced today the completion of construction on a new 250,000-square-foot corporate headquarter campus for Church & Dwight Co., Inc., in Ewing Township, near Princeton, N.J.

| Jan 31, 2013

More cities requiring large buildings to use EPA’s energy management and reporting

In 2012, Philadelphia joined several other U.S. cities in passing a requirement that large buildings use Portfolio Manager, the Environmental Protection Agency’s energy management tool, to measure and report energy performance.

| Jan 29, 2013

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

The new headquarters for Astellas in the Americas in Northbrook, Ill., has been awarded LEED Gold certification by the USGBC.

| Jan 16, 2013

SOM’s innovative Zhengzhou Greenland Plaza opens

The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021