flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oregon to spend $300 million for seismic updates on public buildings

Codes and Standards

Oregon to spend $300 million for seismic updates on public buildings

A survey found that more than 1,000 Oregon school buildings face a high risk of collapse during earthquakes.


By Peter Fabris, Contributing Editor | July 16, 2015
Oregon to spend $300 million for seismic updates on public buildings

Photo: Oreogn State Capitol building. M.O. Stevens, Wikimedia Commons.

Oregon will spend $300 million in construction bond funding for seismic updates on public buildings.

The funds are included in the legislature’s $1.2 billion capital construction budget. Sen. Peter Courtney, the state’s Senate president, said the allotment for seismic updates is more than lawmakers have ever put toward such projects, according to the Portland Business Journal.

“We know there will be a major quake. We know too many of our schools will collapse," Courtney said. "These funds will help us fix our schools. These funds will save children’s lives.”

The bond funding plan dedicates $175 million for the Seismic Rehabilitation Grant Program, a program that helps make at-risk schools safer in the event of a major earthquake.

A 2007 Oregon Department of Geology and Mineral Industries survey found that more than 1,000 Oregon school buildings face a high risk of collapse during earthquakes.

Related Stories

Codes and Standards | Mar 5, 2019

Persistent flooding having economic impact on coastal cities

Atlantic City, Annapolis among communities affected.

Codes and Standards | Mar 1, 2019

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.

Codes and Standards | Mar 1, 2019

U.S. cities have become more dangerous for bicyclists and pedestrians

Reduced speed limits, traffic calming, better education seen as keys to improvement.

Codes and Standards | Feb 28, 2019

High-income renters now the fastest-growing housing market segment

Growth is fastest in mid-sized cities with strong economies.

Codes and Standards | Feb 27, 2019

Katerra launches software platform for ‘entire lifecycle of the building process’

Firm is accepting industry applicants to test the product.

Codes and Standards | Feb 26, 2019

AAMA updates two specifications for test methods related to seismic drift

For evaluating window wall, curtain wall and storefront systems.

Codes and Standards | Feb 21, 2019

Researchers develop software that can calculate potential solar energy yield at any location

Accounts for dynamic shading from trees, buildings and other structures.

Codes and Standards | Feb 20, 2019

Hospitals not making much progress in reducing their carbon footprint

Energy benchmarking survey shows flat emissions pattern over past 20 years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021