flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA’s top 10 violations for 2013

OSHA’s top 10 violations for 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations.


By BD+C Staff | October 1, 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations, according to a presentation by OSHA officials at the 2013 National Safety Council Congress & Expo in Chicago. During the past 12 months, a total of 8,241 fall protection violations were issued by the agency.

 

 

 

 

The FY 2013 top 10 are:

1.  1926.501 – Fall Protection 8,241 violations

2.  1910.1200 – Hazard Communication 6,156

3.  1926.451 – Scaffolding 5,423

4.  1910.134 – Respiratory Protection 3,879

5.  1910.305 – Electrical, Wiring Methods 3,452

6.  1910.178 – Powered Industrial Trucks 3,340

7.  1926.1053 – Ladders 3,311

8.  1910.147 – Lockout/Tagout 3,254

9.  1910.303 – Electrical, General Requirements 2,745

10. 1910.212 – Machine Guarding 2,701

Data Source: OIS Standards Cited Report Dated 9/13/13

 

About the National Safety Council
Founded in 1913 and chartered by Congress, the National Safety Council, nsc.org<http://nsc.org/>, is a nonprofit organization whose mission is to save lives by preventing injuries and deaths at work, in homes and communities, and on the road through leadership, research, education and advocacy. NSC advances this mission by partnering with businesses, government agencies, elected officials and the public in areas where we can make the most impact – distracted driving, teen driving, workplace safety, prescription drug overdoses and Safe Communities. Safety+Health<http://www.safetyandhealthmagazine.com/> magazine, the Council’s flagship publication, is a leading source of occupational safety and health information.

Related Stories

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021