flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA’s top 10 violations for 2013

OSHA’s top 10 violations for 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations.


By BD+C Staff | October 1, 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations, according to a presentation by OSHA officials at the 2013 National Safety Council Congress & Expo in Chicago. During the past 12 months, a total of 8,241 fall protection violations were issued by the agency.

 

 

 

 

The FY 2013 top 10 are:

1.  1926.501 – Fall Protection 8,241 violations

2.  1910.1200 – Hazard Communication 6,156

3.  1926.451 – Scaffolding 5,423

4.  1910.134 – Respiratory Protection 3,879

5.  1910.305 – Electrical, Wiring Methods 3,452

6.  1910.178 – Powered Industrial Trucks 3,340

7.  1926.1053 – Ladders 3,311

8.  1910.147 – Lockout/Tagout 3,254

9.  1910.303 – Electrical, General Requirements 2,745

10. 1910.212 – Machine Guarding 2,701

Data Source: OIS Standards Cited Report Dated 9/13/13

 

About the National Safety Council
Founded in 1913 and chartered by Congress, the National Safety Council, nsc.org<http://nsc.org/>, is a nonprofit organization whose mission is to save lives by preventing injuries and deaths at work, in homes and communities, and on the road through leadership, research, education and advocacy. NSC advances this mission by partnering with businesses, government agencies, elected officials and the public in areas where we can make the most impact – distracted driving, teen driving, workplace safety, prescription drug overdoses and Safe Communities. Safety+Health<http://www.safetyandhealthmagazine.com/> magazine, the Council’s flagship publication, is a leading source of occupational safety and health information.

Related Stories

| Oct 11, 2011

Onex completes investment in JELD-WEN

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.

| Oct 7, 2011

GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011

  Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings. 

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

  Wins reinforce Otis’ position as leader in energy-efficient products.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

| Oct 7, 2011

GREENBUILD 2011: Schools program receives grant to track student conservation results

To track results, schools will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy.

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021