flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA’s top 10 violations for 2013

OSHA’s top 10 violations for 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations.


By BD+C Staff | October 1, 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations, according to a presentation by OSHA officials at the 2013 National Safety Council Congress & Expo in Chicago. During the past 12 months, a total of 8,241 fall protection violations were issued by the agency.

 

 

 

 

The FY 2013 top 10 are:

1.  1926.501 – Fall Protection 8,241 violations

2.  1910.1200 – Hazard Communication 6,156

3.  1926.451 – Scaffolding 5,423

4.  1910.134 – Respiratory Protection 3,879

5.  1910.305 – Electrical, Wiring Methods 3,452

6.  1910.178 – Powered Industrial Trucks 3,340

7.  1926.1053 – Ladders 3,311

8.  1910.147 – Lockout/Tagout 3,254

9.  1910.303 – Electrical, General Requirements 2,745

10. 1910.212 – Machine Guarding 2,701

Data Source: OIS Standards Cited Report Dated 9/13/13

 

About the National Safety Council
Founded in 1913 and chartered by Congress, the National Safety Council, nsc.org<http://nsc.org/>, is a nonprofit organization whose mission is to save lives by preventing injuries and deaths at work, in homes and communities, and on the road through leadership, research, education and advocacy. NSC advances this mission by partnering with businesses, government agencies, elected officials and the public in areas where we can make the most impact – distracted driving, teen driving, workplace safety, prescription drug overdoses and Safe Communities. Safety+Health<http://www.safetyandhealthmagazine.com/> magazine, the Council’s flagship publication, is a leading source of occupational safety and health information.

Related Stories

| Sep 28, 2011

Look who's coming to BD+C's Under-40 Leadership Summit

AEC industry "under-40 superstars" from top design and construction firms have signed up for BD+C's "Under-40 Leadership Summit."

| Sep 28, 2011

GBCI announces LEED fellow class of 2011

  LEED Fellows represent green building industry's most accomplished professionals.

| Sep 28, 2011

Opus Group awarded contract for new Church & Dwight Co. headquarters

The campus will include two 125,000-sf Class A, energy-efficient office buildings that will be designed and constructed with sustainable practices and elements. 

| Sep 27, 2011

Steel Joist Institute announces October webinar on Open Web Steel Joists

Webinar participants can earn 0.15 CEUs or 1.5 PDHs.

| Sep 27, 2011

FDI hires Allen to round out project team

Allen's experience includes managing several multi-million dollar facilities projects for Stanford University.

| Sep 26, 2011

Janus Elevator products spins off monitor controls

Elevator fixture line to operate independently of safety edge and communication business.

| Sep 26, 2011

Copper helps serve and protect Lightning Alley

Copper grounding upgrades add protection and reliability to Florida Sheriff's Department.

| Sep 23, 2011

ABI turns positive after four monthly declines

On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August.

| Sep 23, 2011

Wall Street adage proving true for the office market

Sale prices for office buildings enjoyed a moderate bounce to the upside, following the financial crisis of 2007 - 2008. 

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021