The Board of Regents of the American College of Healthcare Architects (ACHA) has named Peter L. Bardwell, FAIA, FACHA of Columbus, Ohio as 2013 national President.
“We should strive to be the most visible and the most positive influence in the marketplace among all healthcare design organizations, “noted Bardwell in his initial message to the College. “Achieving ACHA certification should mark the recognition that this is an obligation to serve as an effective leader and mentor.”
Established in 1999, ACHA (www.healtharchitects.org) offers board certification within the specialized field of healthcare architecture and is the first specialty certification program to be recognized by the American Institute of Architects (AIA). Certificate holders include healthcare architects throughout the United States and Canada with specialized skills and proven expertise. Before earning the ACHA Board Certificate, healthcare architects must document their experience and demonstrate their skills through a computer-based examination, submission of a portfolio of relevant work, and provision of references. ACHA requires its certificate holders to work towards the improvement of healthcare architecture on behalf of the public, to practice in an ethical manner, to maintain high standards of specialized continuing education, and to add to the body of knowledge.
Peter L. Bardwell, FAIA, FACHA brings over 35 years of experience in healthcare facilities planning and design spanning 22 states and 5 countries, totaling over $2 Billion in construction value within the past 5 years alone. He is honored to be a nationally-recognized practitioner, speaker, and author in healthcare planning and design --- and to be among fewer than 40 practicing architects in the nation to be recognized as a Fellow in both the American Institute of Architects and the American College of Healthcare Architects.
Founded in 2002 and based in Columbus, Ohio, BARDWELL+associates, LLC (www.bardwellassociates.com), focuses exclusively on the planning and design of healthcare facilities with services including facilities-related strategic planning and positioning, site and facility master planning, and functional space programming and conceptual design.
Contact:
Peter L. Bardwell, FAIA, FACHA
pbardwell@bardwellassociates.com
(614) 239-1639
Related Stories
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 16, 2011
Stalco Construction converts Babylon, N.Y. Town Hall into history museum
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.