flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PGAL acquires Dallas-based Pro Forma Architecture

Architects

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.


By John Caulfield, Senior Editor | March 16, 2016

The fire station in Allen, Texas, which opened in 2012, is a prime example of Pro Forma's expertise in designing municipal buildings. Image: Courtesy of PGAL

Pro Forma Architecture, a 17-year-old Dallas-based firm, has merged with PGAL, an international architectural and engineering firm based in Houston and operating nine other offices in the U.S. and one in Mexico City.

Founded in 1946, PGAL employs more than 200 architects, planners, engineers, and designers. It has a wide-ranging portfolio in office, transportation, hospitality, education, healthcare, recreation, and government. (PGAL just got the okay from the city council at College Station, Texas, for a $1.96 million contract to design a new police station that will sit on 12 acres of city-owned property.)

Pro Forma specializes in designing municipal projects like libraries, senior centers, and fire and police stations. Through this merger, PGAL will expand Pro Forma’s expertise for its growing client list in Texas’s north and central regions.

“Now, there’s no projects we can’t pursue.”

– Jeff Bulla, Co-founder of Pro Forma

Jeff Bulla, AIA, LEED AP BD+C, Pro Forma’s co-founder, is staying on as Principal at PGAL’s Dallas office. He and his company’s four employees moved into PGAL’s office in January.

The 54-year-old Bulla tells BD+C that he began to question Pro Forma’s ability to compete as an independent firm in North Texas when the last recession was raging in 2008-2009. “The big firms started fishing in my pond and going after everything in sight,” he recalls. That made it harder for Pro Forma to get projects and offer competitive packages.

Bulla says he’d been approached by a number of firms about merger opportunities over the past 18 months, but nothing came of those conversations until PGAL came calling last October. At the time PGAL was going through a leadership transition in its Dallas office, which has been around since the early 1990s.

Pro Forma was on PGAL’s radar, says Bulla, because the two firms had competed for projects in several Texas markets, including PGAL’s home base in Houston. “They decided to look for a firm that already had an established reputation,” says Bulla.

He says he was attracted to PGAL’s culture and values, particularly its requirement that all of its principals be actively involved in projects. “I was impressed when I heard that the CEO had an office on the production floor.”

Bulla notes that PGAL’s operations are cloud-based, making collaboration among its offices around the country much easier and more likely. He also singles out PGAL’s generous employee-benefits package, and the company’s commitment to maintaining a stable workforce by shifting jobs among its offices depending on workload, as contributing factors to his decision to sell Pro Forma.

“Now, there’s no projects we can’t pursue,” says Bulla, who is especially eager to take advantage of corporate relocations to Texas. To bolster the Dallas office, he says “we’re looking for talent,” specifically “creative interns proficient in Revit.” He intends to add project architects and managers, and is looking longer term toward possibly adding an engineering principal to the office. 

 

 

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021