flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Mixed-Use

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.


By David Malone, Associate Editor | July 21, 2020
The Orbit aerial

All images courtesy Partisans

The Orbit is Toronto-based architect Partisans’ vision for a next generation community. Located in the town of Innisfil in Ontario, The Orbit will create a cohesive center for Innisfil that will gravitate and grow around a new regional transit link and cultural center.

Located approximately 40 miles north of Toronto, The Orbit will be shaped by mobility, transit links, innovative streets and infrastructure, streetscapes, social interaction, health and wellness, a digital and connected community with an economy based on critical thinking, technology, new tech agriculture, advanced manufacturing, and artificial intelligence. The goal is create a community where small town and rural lifestyles co-exist with the benefits of urban living.

 

The Orbit Transit link

 

The transit link, which marks phase one of the project, will connect Innisfil with Toronto and has recently been unveiled in more detail, showing residential towers, retail, and office space occupying the immediate area around the transit link. Additionally, a new bus route will be developed to allow residents to easily get to and from main hubs and the link. The station, and the entire master plan in general, comprises green spaces and landscaping to create a park-like feel and exist harmoniously with nature.

The planned project has the capacity to absorb 40 million sf of newly built modern community. The regional transit link and the cultural center are slated to be built over the next four years.

 

The Orbit Aerial

 

The Orbit transit link and city street

Tags

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021