flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Photographer creates time-lapse video of 1 WTC using 30,000 photos

Photographer creates time-lapse video of 1 WTC using 30,000 photos

The building has incorporated new security measures to protect it from an incident like the one that felled the first trade towers. 


By BD+C Staff  | August 25, 2014

Brooklyn-based photographer Benjamin Rosamund has created a thought-provoking time-lapse video of the construction of the One World Trade Center, the Daily Mail reports. Choosing from 30,000 photos that he took from the day construction began in 2006 to the day when construction was finished in 2012, Rosamund compressed 1,100 photos to create the two-minute video.  

The One World Trade Center is a controversial piece of architecture—a symbol of recovery after the 9/11 terrorist attacks, the tower was also stalled by many years of arguing between victims' family members and authorities. The completed building is part memorial, part commercial center and part transportation hub. 

The building has incorporated new security measures to protect it from an incident like the one that felled the first trade towers. The first 20 stories of the tower are windowless and made of concrete that can withstand the blast from a truck bomb. All glass is shatter-proof. And the stairs and elevator shafts have their own ventilation system—one staircase is has been reserved for emergency services only. 

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021