TWO NEW PV SYSTEMS OFFER NON-PENETRATING INSTALLATION
Two new PV systems are available: 1) a rigid glass-based polycrystalline silicon module that can be installed on standing seam metal roofs using a non-penetrating clamp, and 2) a flexible, thin film module that can be adhered to the metal roof panel in a factory environment, allowing the PV array and roof panels to be installed simultaneously. These PV systems can be installed on existing and new metal roofs because they don’t penetrate the substrate. Furthermore, a metal roof likely will outlive the solar equipment, saving removal and replacement costs associated with other roof materials.
LIGHT SHELF ALLOWS FOR EASY CLEANING
The InLighten light shelf features an extruded-aluminum chassis system in several panel choices. It comes in depths of up to 30 inches of reflective surface. InLighten light shelf’s new design incorporates a unique mounting bracket that allows the panel to be tilted for cleaning, an important maintenance factor in schools, daycare centers, offices, and other commercial and institutional applications. The light shelf can be attached to multiple curtain wall systems and storefront framing systems for application in new construction and retrofits.
NEW COMBINATION FIRE ALARM/ECS MEETS NFPA, UL, DOD STANDARDS
The Farenhyt Emergency Communication System (ECS) provides fire alarm technology and mass notification capabilities in an all-in-one system. This real-time communications system meets the latest NFPA 72, UL 2572, and Department of Defense standards and runs on most wire-types, making it an effective retrofit option. As many as seven ECS-RCUs (“remote command units”) can tie into a facility’s Farenhyt ECS system to provide live paging in specific areas of a property. BD+C
Related Stories
| Oct 4, 2011
GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.
| Oct 3, 2011
Cauceglia to lead Allsteel’s global accounts
Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.
| Sep 30, 2011
BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery
The new structure serves as the cemetery's focal architectural point and center of operations.
| Sep 30, 2011
Kilbourn joins Perkins Eastman
Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.
| Sep 30, 2011
Design your own floor program
Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility.
| Sep 30, 2011
AAMA offers electronic technical documents with launch of virtual library
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.
| Sep 29, 2011
Submit your Great Solutions
Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction.
| Sep 29, 2011
Busch Engineering, Science and Technology Residence Hall opens to Rutgers students
With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall constructed by Rutgers since 1994.