flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PROJECT SUMMARY MARCH 2004

PROJECT SUMMARY MARCH 2004


August 11, 2010

China Construction Bank regional headquarters

Xiamen , China

Building Team

Owner/developer:

China Construction Bank/Xiamen Jianshen Real Estate Development Co.

Design architect:

MulvannyG2 Architecture

Project architect:

Shanghai Architectural Design Institute

Interior architect:

Oriental Interior Decorating Co.

Structural engineer:

Shanghai Architectural Design Institute

Mechanical/electrical engineer:

Shanghai Architectural Design Institute

General contractor:

Bureua 3; China Construction Co.

General information

Area:

726,000 gross sf

Number of floors:

42

Construction time:

February 1998 to September 2003

Construction cost:

Withheld by owner

Delivery method:

Design/bid/build

Project materials and suppliers

Structural system, decking:

Reinforced concrete structure (exterior frame with interior core)

Curtain wall, cladding, panels:

Shenyang YuanDa Curtainwall Co.

Exterior glazing:

Shanghai Yaohua Glazing Co.

Stone:

Xinjian GuanghuiStone Co. (tower); Italian Stone (podium)

Life safety/security systems:

ABB

Elevators:

Mitsubishi , Japan

Heating/refrigeration:

Carrier

Energy management controls:

Beijing Yingtai Co.

Power/communications duct, raceways, conduit:

ABB

Lighting:

Philips Lighting

boombox1
boombox2
native1
halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021