The Jose Gautier Benitez development is officially under construction on a 21-acre site in Caguas, Puerto Rico. The site will be divided into six residential blocks that includes five streets dedicated to family housing, and one reserved for elderly housing.
Designed by Álvarez-Díaz & Villalón (AD&V), the largest architecture and interior design firm in Puerto Rico, the development will feature 438 new one- and two-bedroom apartments and a five-story elderly housing facility that includes resident lounges, community rooms, fitness rooms, and game rooms. Site improvements include new landscaping, street lighting, parking, walkways, playgrounds, and community gardens.
The Jose Gautier Benitez development was designed with energy conservation and resiliency measures at the forefront. These measures include stormproof windows, environmentally conscious building materials and methods, energy efficient appliances, photovoltaic panels, emergency power generation, and universal design. “In the wake of Hurricane Maria and other recent storms, Puerto Rico has learned the hard way that it must design and construct new buildings with sustainability in mind,” said Cristina Villalón, Managing Principal and Interior Designer of AD&V. “This means not only ensuring all our structures – from affordable housing to high-end residences and hotels – are built to withstand future natural disasters, but that they also have a more limited impact on the environment.“
See Also: Mixed-use community breaks ground in Greenville, S.C.
AD&V is serving as both the architect and interior designer of the project.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.