flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms.


By BD+C Staff | September 14, 2014
Tampa VA Hospital. Photo: courtesy VA
Tampa VA Hospital. Photo: courtesy VA

 

 

 

 

 

 

 

 

 

 

 

Top Veterans Administration Sector Architecture Firms

Rank Company 2013 Veterans Administration Building Revenue
1 CannonDesign $15,000,000
2 Leo A Daly $12,896,157
3 HDR $8,459,200
4 NBBJ $6,464,000
5 Westlake Reed Leskosky $6,325,000
6 Hoefer Wysocki Architecture $6,010,000
7 HOK $5,728,056
8 ZGF Architects $3,565,855
9 Array Architects $2,138,000
10 Hammel, Green and Abrahamson $1,565,733
11 Perkins Eastman $1,540,000
12 Polytech Associates  $1,500,000
13 H+L Architecture $1,295,496
14 Page $1,182,000
15 HMC Architects $1,117,716
16 EwingCole $1,000,000
17 Sherlock, Smith & Adams $932,000
18 Heery International $931,666
19 Epstein $841,000
20 Morris Architects $650,000
21 Perkins+will $595,451
22 Taylor Design $372,052
23 Anderson Mikos Architects $350,000
24 Payette $318,779
25 Cuningham Group Architecture $290,426
26 RBB Architects $215,897
27 Clark Nexsen $200,156
28 LBL Architects $200,000
29 Legat Architects $191,800
30 Emersion Design $127,032
31 FreemanWhite $107,667
32 RSP Architects $74,000
33 NAC|Architecture $69,546
34 Flad Architects $64,840
35 BSA LifeStructures $41,019
36 CTA Architects Engineers $15,948
37 Integrus Architecture $11,473
38 TEG Architects $4,046
39 Bergmann Associates $1,800

 

 

 

Top Veterans Administration Sector Engineering Firms

Rank Company 2013 Veterans Administration Building Revenue
1 URS Corp. $5,737,392
2 Jacobs $5,057,640
3 Heapy Engineering $4,118,394
4 Apogee Consulting Group $2,080,275
5 Degenkolb Engineers $1,974,556
6 Interface Engineering $1,892,305
7 Ross & Baruzzini $1,694,572
8 Parsons Brinckerhoff $1,602,180
9 TTG $1,265,000
10 SSOE Group $1,199,568
11 H.F. Lenz $985,000
12 KJWW Engineering Consultants $953,450
13 Shive-Hattery $937,178
14 BR+A Consulting Engineers $920,000
15 Bridgers & Paxton Consulting Engineers $908,201
16 Dewberry $824,640
17 Mazzetti $800,022
18 Affiliated Engineers $718,000
19 Vanderweil Engineers $635,800
20 Spectrum Engineers $559,365
21 KPFF Consulting Engineers $500,000
22 KCI Technologies $500,000
23 Dunham Associates $500,000
24 Walker Parking Consultants $425,000
25 Syska Hennessy Group $417,504
26 STV $279,000
27 I. C. Thomasson Associates $250,000
28 Simpson Gumpertz & Heger $200,000
29 RMF Engineering $150,000
30 M-E Engineers $100,000
31 Wiss, Janney, Elstner Associates $100,000
32 TLC Engineering for Architecture $77,955
33 Brinjac Engineering $77,934
34 Glumac $77,370
35 Sparling $75,751
36 Henderson Engineers $69,000
37 Wick Fisher White $59,800
38 Aon Fire Protection Engineering Corp. $16,631
39 Allen & Shariff $15,000
40 G&W Engineering Corp. $14,200
41 Guernsey $5,361
42 Paulus, Sokolowski and Sartor $5,000

 

 

 

Top Veterans Administration Sector Construction Firms

Rank Company 2013 Veterans Administration Building Revenue
1 Clark Group $376,422,744
2 McCarthy Holdings $119,000,000
3 Brasfield & Gorrie $113,174,998
4 Walsh Group, The $107,708,781
5 Turner Construction $89,741,651
6 Gilbane $17,780,000
7 McShane Companies, The $17,672,043
8 Haselden Construction $13,342,778
9 Sundt Construction $12,865,799
10 Tutor Perini Corp. $9,980,863
11 Lend Lease $5,846,000
12 Manhattan Construction $5,631,000
13 Parsons Brinckerhoff $1,602,180
14 New South Construction $1,094,000
15 Alberici Constructors $1,080,320
16 Heery International $931,666
17 Hunt Construction Group $800,000
18 Astorino $662,420
19 S. M. Wilson & Co. $559,870
20 Hoar Construction $311,000
21 STV $279,000
22 CORE Construction Group $242,415
23 LPCiminelli $131,135
24 DPR Construction $101,416
25 Allen & Shariff $15,000
26 BlueScope Construction $6,138
27 Absher Construction $1,009

 

Read BD+C's full 2014 Giants 300 Report 

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021