flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms.


By BD+C Staff | September 14, 2014
Tampa VA Hospital. Photo: courtesy VA
Tampa VA Hospital. Photo: courtesy VA

 

 

 

 

 

 

 

 

 

 

 

Top Veterans Administration Sector Architecture Firms

Rank Company 2013 Veterans Administration Building Revenue
1 CannonDesign $15,000,000
2 Leo A Daly $12,896,157
3 HDR $8,459,200
4 NBBJ $6,464,000
5 Westlake Reed Leskosky $6,325,000
6 Hoefer Wysocki Architecture $6,010,000
7 HOK $5,728,056
8 ZGF Architects $3,565,855
9 Array Architects $2,138,000
10 Hammel, Green and Abrahamson $1,565,733
11 Perkins Eastman $1,540,000
12 Polytech Associates  $1,500,000
13 H+L Architecture $1,295,496
14 Page $1,182,000
15 HMC Architects $1,117,716
16 EwingCole $1,000,000
17 Sherlock, Smith & Adams $932,000
18 Heery International $931,666
19 Epstein $841,000
20 Morris Architects $650,000
21 Perkins+will $595,451
22 Taylor Design $372,052
23 Anderson Mikos Architects $350,000
24 Payette $318,779
25 Cuningham Group Architecture $290,426
26 RBB Architects $215,897
27 Clark Nexsen $200,156
28 LBL Architects $200,000
29 Legat Architects $191,800
30 Emersion Design $127,032
31 FreemanWhite $107,667
32 RSP Architects $74,000
33 NAC|Architecture $69,546
34 Flad Architects $64,840
35 BSA LifeStructures $41,019
36 CTA Architects Engineers $15,948
37 Integrus Architecture $11,473
38 TEG Architects $4,046
39 Bergmann Associates $1,800

 

 

 

Top Veterans Administration Sector Engineering Firms

Rank Company 2013 Veterans Administration Building Revenue
1 URS Corp. $5,737,392
2 Jacobs $5,057,640
3 Heapy Engineering $4,118,394
4 Apogee Consulting Group $2,080,275
5 Degenkolb Engineers $1,974,556
6 Interface Engineering $1,892,305
7 Ross & Baruzzini $1,694,572
8 Parsons Brinckerhoff $1,602,180
9 TTG $1,265,000
10 SSOE Group $1,199,568
11 H.F. Lenz $985,000
12 KJWW Engineering Consultants $953,450
13 Shive-Hattery $937,178
14 BR+A Consulting Engineers $920,000
15 Bridgers & Paxton Consulting Engineers $908,201
16 Dewberry $824,640
17 Mazzetti $800,022
18 Affiliated Engineers $718,000
19 Vanderweil Engineers $635,800
20 Spectrum Engineers $559,365
21 KPFF Consulting Engineers $500,000
22 KCI Technologies $500,000
23 Dunham Associates $500,000
24 Walker Parking Consultants $425,000
25 Syska Hennessy Group $417,504
26 STV $279,000
27 I. C. Thomasson Associates $250,000
28 Simpson Gumpertz & Heger $200,000
29 RMF Engineering $150,000
30 M-E Engineers $100,000
31 Wiss, Janney, Elstner Associates $100,000
32 TLC Engineering for Architecture $77,955
33 Brinjac Engineering $77,934
34 Glumac $77,370
35 Sparling $75,751
36 Henderson Engineers $69,000
37 Wick Fisher White $59,800
38 Aon Fire Protection Engineering Corp. $16,631
39 Allen & Shariff $15,000
40 G&W Engineering Corp. $14,200
41 Guernsey $5,361
42 Paulus, Sokolowski and Sartor $5,000

 

 

 

Top Veterans Administration Sector Construction Firms

Rank Company 2013 Veterans Administration Building Revenue
1 Clark Group $376,422,744
2 McCarthy Holdings $119,000,000
3 Brasfield & Gorrie $113,174,998
4 Walsh Group, The $107,708,781
5 Turner Construction $89,741,651
6 Gilbane $17,780,000
7 McShane Companies, The $17,672,043
8 Haselden Construction $13,342,778
9 Sundt Construction $12,865,799
10 Tutor Perini Corp. $9,980,863
11 Lend Lease $5,846,000
12 Manhattan Construction $5,631,000
13 Parsons Brinckerhoff $1,602,180
14 New South Construction $1,094,000
15 Alberici Constructors $1,080,320
16 Heery International $931,666
17 Hunt Construction Group $800,000
18 Astorino $662,420
19 S. M. Wilson & Co. $559,870
20 Hoar Construction $311,000
21 STV $279,000
22 CORE Construction Group $242,415
23 LPCiminelli $131,135
24 DPR Construction $101,416
25 Allen & Shariff $15,000
26 BlueScope Construction $6,138
27 Absher Construction $1,009

 

Read BD+C's full 2014 Giants 300 Report 

Related Stories

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

University Buildings | Jun 14, 2023

Calif. State University’s new ‘library-plus’ building bridges upper and lower campuses

A three-story “library-plus” building at California State University, East Bay (CSUEB) that ties together the upper and lower campuses was recently completed. The 100,977-sf facility, known as the Collaborative Opportunities for Research & Engagement (“CORE”) Building, is one of the busiest libraries in the CSU system. The previous library served 1.2 million visitors annually.

Higher Education | Jun 14, 2023

Designing higher education facilities without knowing the end users

A team of architects with Page offers five important factors to consider when designing spaces for multiple—and potentially changing—stakeholders.

Resiliency | Jun 14, 2023

HUD offers $4.8 billion in funding for green and resilient building retrofit projects

The Department of Housing and Urban Development (HUD) recently released guidelines for its Green and Resilient Retrofit Program (GRRP) that has $4.8 billion for funding green projects.

Arenas | Jun 14, 2023

A multipurpose arena helps revitalize a historic African American community in Georgia

In Savannah, Ga., Enmarket Arena, a multipurpose arena that opened last year, has helped revitalize the city’s historic Canal District—home to a largely African American community that has been historically separated from the rest of downtown.

Building Materials | Jun 14, 2023

Construction input prices fall 0.6% in May 2023

Construction input prices fell 0.6% in May compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices declined 0.5% for the month.

Mass Timber | Jun 13, 2023

Mass timber construction featured in two-story mixed-use art gallery and wine bar in Silicon Valley

The Edes Building, a two-story art gallery and wine bar in the Silicon Valley community of Morgan Hill, will prominently feature mass timber. Cross-laminated timber (CLT) and glulam posts and beams were specified for aesthetics, biophilic properties, and a reduced carbon footprint compared to concrete and steel alternatives.

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

Engineers | Jun 12, 2023

Stantec to acquire Environmental Systems Design

Stantec, a global leader in sustainable design and engineering, has signed an agreement to acquire Environmental Systems Design, Inc. (ESD), a 270-person engineering firm headquartered in Chicago. Founded in 1967, ESD has built a reputation for excellence and innovation in high-performance design with a roster of industry-leading clients. The terms of the transaction are not disclosed.

University Buildings | Jun 9, 2023

Cornell’s new information science building will foster dynamic exchange of ideas and quiet, focused research

Construction recently began on Cornell University’s new 135,000-sf building for the Cornell Ann S. Bowers College of Computing and Information Science (Cornell Bowers CIS). The structure will bring together the departments of Computer Science, Information Science, and Statistics and Data Science for the first time in one complex.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021