flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms.


By BD+C Staff | September 14, 2014
Tampa VA Hospital. Photo: courtesy VA
Tampa VA Hospital. Photo: courtesy VA

 

 

 

 

 

 

 

 

 

 

 

Top Veterans Administration Sector Architecture Firms

Rank Company 2013 Veterans Administration Building Revenue
1 CannonDesign $15,000,000
2 Leo A Daly $12,896,157
3 HDR $8,459,200
4 NBBJ $6,464,000
5 Westlake Reed Leskosky $6,325,000
6 Hoefer Wysocki Architecture $6,010,000
7 HOK $5,728,056
8 ZGF Architects $3,565,855
9 Array Architects $2,138,000
10 Hammel, Green and Abrahamson $1,565,733
11 Perkins Eastman $1,540,000
12 Polytech Associates  $1,500,000
13 H+L Architecture $1,295,496
14 Page $1,182,000
15 HMC Architects $1,117,716
16 EwingCole $1,000,000
17 Sherlock, Smith & Adams $932,000
18 Heery International $931,666
19 Epstein $841,000
20 Morris Architects $650,000
21 Perkins+will $595,451
22 Taylor Design $372,052
23 Anderson Mikos Architects $350,000
24 Payette $318,779
25 Cuningham Group Architecture $290,426
26 RBB Architects $215,897
27 Clark Nexsen $200,156
28 LBL Architects $200,000
29 Legat Architects $191,800
30 Emersion Design $127,032
31 FreemanWhite $107,667
32 RSP Architects $74,000
33 NAC|Architecture $69,546
34 Flad Architects $64,840
35 BSA LifeStructures $41,019
36 CTA Architects Engineers $15,948
37 Integrus Architecture $11,473
38 TEG Architects $4,046
39 Bergmann Associates $1,800

 

 

 

Top Veterans Administration Sector Engineering Firms

Rank Company 2013 Veterans Administration Building Revenue
1 URS Corp. $5,737,392
2 Jacobs $5,057,640
3 Heapy Engineering $4,118,394
4 Apogee Consulting Group $2,080,275
5 Degenkolb Engineers $1,974,556
6 Interface Engineering $1,892,305
7 Ross & Baruzzini $1,694,572
8 Parsons Brinckerhoff $1,602,180
9 TTG $1,265,000
10 SSOE Group $1,199,568
11 H.F. Lenz $985,000
12 KJWW Engineering Consultants $953,450
13 Shive-Hattery $937,178
14 BR+A Consulting Engineers $920,000
15 Bridgers & Paxton Consulting Engineers $908,201
16 Dewberry $824,640
17 Mazzetti $800,022
18 Affiliated Engineers $718,000
19 Vanderweil Engineers $635,800
20 Spectrum Engineers $559,365
21 KPFF Consulting Engineers $500,000
22 KCI Technologies $500,000
23 Dunham Associates $500,000
24 Walker Parking Consultants $425,000
25 Syska Hennessy Group $417,504
26 STV $279,000
27 I. C. Thomasson Associates $250,000
28 Simpson Gumpertz & Heger $200,000
29 RMF Engineering $150,000
30 M-E Engineers $100,000
31 Wiss, Janney, Elstner Associates $100,000
32 TLC Engineering for Architecture $77,955
33 Brinjac Engineering $77,934
34 Glumac $77,370
35 Sparling $75,751
36 Henderson Engineers $69,000
37 Wick Fisher White $59,800
38 Aon Fire Protection Engineering Corp. $16,631
39 Allen & Shariff $15,000
40 G&W Engineering Corp. $14,200
41 Guernsey $5,361
42 Paulus, Sokolowski and Sartor $5,000

 

 

 

Top Veterans Administration Sector Construction Firms

Rank Company 2013 Veterans Administration Building Revenue
1 Clark Group $376,422,744
2 McCarthy Holdings $119,000,000
3 Brasfield & Gorrie $113,174,998
4 Walsh Group, The $107,708,781
5 Turner Construction $89,741,651
6 Gilbane $17,780,000
7 McShane Companies, The $17,672,043
8 Haselden Construction $13,342,778
9 Sundt Construction $12,865,799
10 Tutor Perini Corp. $9,980,863
11 Lend Lease $5,846,000
12 Manhattan Construction $5,631,000
13 Parsons Brinckerhoff $1,602,180
14 New South Construction $1,094,000
15 Alberici Constructors $1,080,320
16 Heery International $931,666
17 Hunt Construction Group $800,000
18 Astorino $662,420
19 S. M. Wilson & Co. $559,870
20 Hoar Construction $311,000
21 STV $279,000
22 CORE Construction Group $242,415
23 LPCiminelli $131,135
24 DPR Construction $101,416
25 Allen & Shariff $15,000
26 BlueScope Construction $6,138
27 Absher Construction $1,009

 

Read BD+C's full 2014 Giants 300 Report 

Related Stories

Urban Planning | Apr 12, 2023

Watch: Trends in urban design for 2023, with James Corner Field Operations

Isabel Castilla, a Principal Designer with the landscape architecture firm James Corner Field Operations, discusses recent changes in clients' priorities about urban design, with a focus on her firm's recent projects.

3D Printing | Apr 11, 2023

University of Michigan’s DART Laboratory unveils Shell Wall—a concrete wall that’s lightweight and freeform 3D printed 

The University of Michigan’s DART Laboratory has unveiled a new product called Shell Wall—which the organization describes as the first lightweight, freeform 3D printed and structurally reinforced concrete wall. The innovative product leverages DART Laboratory’s research and development on the use of 3D-printing technology to build structures that require less concrete. 

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

University Buildings | Apr 11, 2023

Supersizing higher education: Tracking the rise of mega buildings on university campuses

Mega buildings on higher education campuses aren’t unusual. But what has been different lately is the sheer number of supersized projects that have been in the works over the last 12–15 months.

Architects | Apr 10, 2023

Bill Hellmuth, FAIA, Chairman and CEO of HOK, dies at 69

William (Bill) Hellmuth, FAIA, the Chairman and CEO of HOK, passed away on April 6, 2023, after a long illness. Hellmuth designed dozens of award-winning buildings across the globe, including the Abu Dhabi National Oil Company Headquarters and the U.S. Embassy in Nairobi.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

Mixed-Use | Apr 7, 2023

New Nashville mixed-use high-rise features curved, stepped massing and wellness focus

Construction recently started on 5 City Blvd, a new 15-story office and mixed-use building in Nashville, Tenn. Located on a uniquely shaped site, the 730,000-sf structure features curved, stepped massing and amenities with a focus on wellness.

Smart Buildings | Apr 7, 2023

Carnegie Mellon University's research on advanced building sensors provokes heated controversy

A research project to test next-generation building sensors at Carnegie Mellon University provoked intense debate over the privacy implications of widespread deployment of the devices in a new 90,000-sf building. The light-switch-size devices, capable of measuring 12 types of data including motion and sound, were mounted in more than 300 locations throughout the building.

Affordable Housing | Apr 7, 2023

Florida’s affordable housing law expected to fuel multifamily residential projects

Florida Gov. Ron DeSantis recently signed into law affordable housing legislation that includes $711 million for housing programs and tax breaks for developers. The new law will supersede local governments’ zoning, density, and height requirements.

Energy Efficiency | Apr 7, 2023

Department of Energy makes $1 billion available for states, local governments to upgrade building codes

The U.S. Department of Energy is offering funding to help state and local governments upgrade their building codes to boost energy efficiency. The funding will support improved building codes that reduce carbon emissions and improve energy efficiency, according to DOE.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021