flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 19, 2013
Rank Company 2012 Reconstruction Revenue ($)
1 Stantec $280,352,652
2 HOK $134,237,400
3 HDR Architecture $114,065,000
4 Cannon Design $87,000,000
5 Wight & Co. $78,367,600
6 HKS $72,000,000
7 HMC Architects $62,356,949
8 Astorino $55,944,000
9 Leo A Daly $55,674,775
10 Perkins+Will $54,045,000
11 EYP $51,228,701
12 SmithGroupJJR $49,980,000
13 Callison $46,939,398
14 DLR Group $46,400,000
15 Hammel, Green and Abrahamson $44,920,000
16 Perkins Eastman $43,500,000
17 Gresham, Smith and Partners $40,967,355
18 NELSON $37,876,729
19 ZGF Architects $37,291,618
20 MBH Architects $32,124,000
21 HLW International $30,000,000
22 Beyer Blinder Belle Architects & Planners $27,554,840
23 FRCH Design Worldwide $26,500,000
24 WD Partners $25,900,000
25 Corgan $25,613,112
26 EwingCole $25,500,000
27 LPA $25,104,465
28 Perkowitz+Ruth Architects $21,597,000
29 Shepley Bulfinch Richardson & Abbott $21,585,246
30 SMMA | Symmes Maini & McKee Associates $21,555,000
31 PageSoutherlandPage $19,700,000
32 Swanke Hayden Connell Asrchitects $19,500,000
33 S/L/A/M Collaborative, The $19,341,768
34 Flad Architects $18,750,000
35 BSA LifeStructures $18,233,154
36 Ware Malcomb $17,750,000
37 Reynolds, Smith and Hills $17,440,000
38 Westlake Reed Leskosky $16,640,000
39 WHR Architects $16,487,132
40 Array Architects $16,160,317
41 Harley Ellis Devereaux $15,662,000
42 NTD Architecture $14,129,224
43 Francis Cauffman $13,678,748
44 RBB Architects $13,112,000
45 GBBN Architects $12,785,000
46 HNTB Archtecture $12,362,040
47 CTA Architects Engineers $12,006,185
48 Epstein $11,564,000
49 Fentress Architects $11,560,000
50 Nadel $11,000,000
51 Fletcher-Thompson $10,945,000
52 Ennead Architects $10,800,000
53 Baskervill $10,410,000
54 Moody Nolan $10,400,000
55 Hoffmann Architects $10,288,000
56 Payette $9,955,110
57 Legat Architects $9,821,000
58 FreemanWhite $9,801,940
59 Albert Kahn Family of Companies $9,788,300
60 PBK $9,442,500
61 CASCO $9,187,500
62 OZ Architecture $9,013,200
63 Kaplan McLaughlin Diaz $9,000,000
64 Lord, Aeck & Sargent $8,960,000
65 Fanning/Howey Associates $8,548,000
66 Environetics $8,446,957
67 Moseley Architects $8,077,754
68 Cambridge Seven Associates $7,873,500
69 LMN Architects $7,674,100
70 FKP Architects $7,370,000
71 Integrated Design Group $7,276,959
72 Cooper Carry $6,857,442
73 FXFOWLE Architects $6,801,127
74 Anderson Mikos Architects $6,763,800
75 BBG-BBGM $6,400,000
76 Kirksey Architecture $6,345,757
77 FGM Architects $6,257,500
78 Morris Architects $5,850,000
79 KZF Design $5,115,849
80 Margulies Perruzzi Architects $5,032,276
81 Sherlock, Smith & Adams $4,968,000
82 SEI Design Group $4,603,000
83 Harvard Jolly Architecture $4,477,699
84 Sasaki Associates $4,358,670
85 Omniplan Architects $4,314,833
86 Hoefer Wysocki Architecture $4,138,000
87 H3 Hardy Collaboration Architecture $3,916,000
88 Massa Montalto Architects $3,873,094
89 BBS Architects, Landscape Architects and Engineers $3,705,000
90 DLA Architects $3,653,780
91 Polytech Associates $3,600,000
92 LawKingdon Architecture $3,500,000
92 JRS Architect $3,500,000
94 SLATERPAULL Architects $3,076,914
95 Lee, Burkhart, Liu $3,045,000
96 Emersion Design $2,586,536
97 RDH Interests $2,241,463
98 Carrier Johnson + Culture $2,200,448
99 Goettsch Partners $1,890,000
100 AXIS Architecture + Design $1,869,734
101 Ballinger $1,855,251
102 Adache Group Architects $1,800,000
103 Davis Brody Bond $1,622,231
104 Rule Joy Trammell + Rubio $1,550,000
105 Hnedak Bobo Group $1,545,000
106 api(+) $1,462,000
107 CO Architects $1,325,000
108 Architekton $1,091,145
109 DJM Architecture $309,330
110 WDG Architecture $121,000
111 PHX Architecture $120,000
112 Hensley Lamkin Rachel $41,000

 

Back to the Reconstruction Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Oct 13, 2010

County building aims for the sun, shade

The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Richmond CenterStage, Richmond, Va.

27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.

| Oct 12, 2010

University of Toledo, Memorial Field House

27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.

| Oct 12, 2010

Owen Hall, Michigan State University, East Lansing, Mich.

27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Oct 12, 2010

Cell and Genome Sciences Building, Farmington, Conn.

27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Oct 12, 2010

Cuyahoga County Soldiers’ and Sailors’ Monument, Cleveland, Ohio

27th Annual Reconstruction Awards—Gold Award. The Cuyahoga County Soldiers’ and Sailors’ Monument was dedicated on the Fourth of July, 1894, to honor the memory of the more than 9,000 Cuyahoga County veterans of the Civil War.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021