flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sacramento moves forward on multifamily project with new modular supplier

Multifamily Housing

Sacramento moves forward on multifamily project with new modular supplier

Guerdon Modular Buildings will provide modules for 118 apartments.


By John Caulfield, Senior Editor | June 1, 2015
Sacramento moves forward on multifamily project with new modular supplier

Guerdon Modular Buildings is taking over the Eviva Downtown multifamily project. Rendering courtesy Guerdon Modular Buildings.

This month, Guerdon Modular Buildings, a leading manufacturer of modular housing for the western U.S. and Canada, will start factory construction of modules for Eviva Midtown, a six-story apartment building in downtown Sacramento, Calif., that will have 118 condominium-style one- and two -bedroom rental units, ranging from 700 to 1,200 sf.

Guerdon took over as the module supplier for this project when its developer, Integral Development, decided to switch manufacturers once the previous modular subcontractor encountered planning and scheduling problems soon after the project’s groundbreaking in September 2014.

Eviva Downtown, which was once called The Warren, had been in development for nearly a decade before that groundbreaking. “Eviva is a chance for our deep bench of design, engineering, and construction professionals to demonstrate how our modular construction technology dramatically speeds the build process over traditional on-site approaches without any sacrifice to design or aesthetics,” says Curtis Fletcher, Guerdon’s business development manager. 

This building, Sacramento’s largest modular project to date, was initiated by the Capital Area Development Authority (CADA). Integral developed this project in partnership with Sacramento-based investment firm LDK Ventures. Tricorp Hearn Construction is the GC.

During the delay caused by the modular musical chairs, Integral and CADA revisited their plans for this project and made a number of modifications and structural changes to its design. To make it more distinct from neighboring buildings, they widened Eviva’s balconies, made its corners slightly taller than the rest of the project, and added a broader color palette. 

The building team chose Guerdon because its reputation for handling large-scale projects and completing modules on time. 

“Guerdon has integrated so closely with our staff that every aspect of the construction process has been worry-free, from the design and build to mapping out the delivery and installation,” says Dave Bruss, chief operations officer at Tricorp Hearn, which is based in Sacramento. On-site module installation is scheduled to begin in August. 

Located on the corner of 16th and N Streets, Eviva is part of an ongoing revival of Sacramento’s downtown area. For example, the $31 million renovation and restoration of the city’s 89-year-old, 68,000-sf Sacramento Valley Station—the busiest Amtrak depot west of Chicago—is one of the centerpieces of a large downtown redevelopment, which includes a Sacramento Entertainment and Sports Complex accompanied by a 16-story mixed-use hotel, retail, and residential complex designed by Los Angeles-based Rios Clementi Hale Studios. AECOM is the lead architect for the arena, which is scheduled to open October 2016, according to The Architects Newspaper.

Related Stories

Multifamily Housing | Oct 10, 2018

Affordable treasures

This year’s prestigious Gold Nugget Awards honor four projects that provide affordably priced housing for homeless families, seniors, and veterans.

Multifamily Housing | Oct 9, 2018

Breaking new ground: The New Home Company

The company, which is headquartered in Aliso Viejo, Calif. relies heavily on focus groups and market research to understand buyer preferences specific to each new community.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Multifamily Housing | Sep 25, 2018

Fitness centers go for wellness

Equipment choice, room size, program offerings—a lot of thinking has to go into creating a fitness facility that pays off in resident satisfaction.

Multifamily Housing | Sep 24, 2018

Topsy-turvy: Creative use of air rights results in a model of urban luxury design

Using bold cantilevering and imaginative structural design, ODA and its project team created a 12-story building whose massing grows in width as it steps upward.

Multifamily Housing | Sep 21, 2018

A place of ‘voluntary and cheerful resort’

A project team soldiers on in the wake of a nightmarish turn of events.

Multifamily Housing | Sep 19, 2018

Multifamily market trends 2018: What the experts are saying

The growth of keyless entry solutions and demand for oversized units are among the trends and ideas shared at Marcus & Millichap’s 2018 Multifamily Forum in Chicago.

Multifamily Housing | Aug 27, 2018

5 noteworthy multifamily projects: summer 2018 edition

The 5 buildings highlight MFDC's summer issue noteworthy projects section.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021