The new build-out of the BCCI Construction Company’s headquarters in San Francisco, Calif., is the 31st WELL v1Certified project in the world, the 18th certified project in the U.S., the sixth in California, and the first in San Francisco.
The headquarters space, which was designed and constructed by BCCI Construction Company, supports project collaboration and interaction while also incorporating quiet spaces for focused work.
The new BCCI Construction Company headquarters uses materials and furnishings with low-emitting volatile organic compounds to ensure healthy air for employees. The removal of both office walls and low ceilings connects employees to the natural environment and fills the space with natural light. Other office features include sit-stand desks, ergonomic chairs, private focus rooms, phone rooms, a wellness room, a lounge area, and a patio.
A bicycle rack is available for employees who ride to work and filtered water stations encourage everyone to drink more water. Local organic fruits and vegetables are provided twice weekly to ensure nutritious foods are regularly available.
In addition to BCCI Construction Company, the Building Team also included Partner Engineering and Science as the structural engineer and Amit Wadhwa & Associates as the MEP engineer.
Related Stories
| Mar 27, 2012
Bank of America Plaza becomes Atlanta's priciest repo
Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.
| Mar 26, 2012
McCarthy tops off Math and Science Building at San Diego Mesa College
Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.
| Mar 26, 2012
Ball State University completes nation's largest ground-source geothermal system
Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.
| Mar 21, 2012
10 common data center surprises
Technologies and best practices provide path for better preparation.
| Mar 20, 2012
New office designs at San Diego’s Sunroad Corporate Center
Traditional office space being transformed into a modern work environment, complete with private offices, high-tech conference rooms, a break room, and an art gallery, as well as standard facilities and amenities.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.