flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

Mixed-Use

Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

The mixed-use development will connect some of Detroit’s key public spaces.


By David Malone, Associate Editor | December 14, 2018
Monroe Blocks exterior

Courtesy Hayes Davidson

The northeast corner of Detroit’s Campus Martius Park will be home to Monroe Blocks, Schmidt hammer Lassen Architect’s first U.S. project. The project will span a 134,548-sf site across two city blocks and include the first high-rise office tower built in downtown Detroit in more than 25 years.

Monroe Blocks will include a mix of modern office space, residential units, restaurants, retail, and approximately 51,660 sf of public outdoor space. Schmidt Hammer Lassen will work with Neumann/Smith Architecture to reintroduce historic alleyways and public access points and prioritize the public realm by connecting the outdoors with each structure’s ground floor.

See Also: 62-story luxury rental tower provides 40,000 sf of indoor and outdoor amenities in Manhattan

 

Monroe Block retail spaceCourtesy Schmidt Hammer Lassen Architects.

 

The development is being built in an area that was known as Detroit’s first theater district. The National Theatre, the sole remaining building from this original theater district, will have its ornate terracotta archway incorporated into the Monroe Blocks design. It will be disassembled, catalogued, and relocated to a new pedestrian walkway that will bisect the new development.

 

Monroe Block interior office floorCourtesy Schmidt Hammer Lassen Architects.

 

A groundbreaking event recently took place on Monroe Banks Plot A, which will include a 35-storey glass and terracotta office tower, a 17-story, 148-unit residential building, and a total of 66,000 sf of retail space.

Monroe Blocks is scheduled to complete in early 2022.

 

Monroe Blocks aerial viewCourtesy Hayes Davidson.

 

Monroe Blocks courtyardCourtesy Hayes Davidson.

Tags

Related Stories

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021