Melo Group has launched sales for Aria on the Bay, a 647-unit luxury condominium in Miami. The bayfront condo will overlook Margaret Pace Park, Biscayne Bay, and the Miami Beach skyline. Construction is scheduled to begin in mid-2015, with completion slated for 2017, Architecture Lab reports.
Designed by Arquitectonica, the development is planned for the city's resurging Arts & Entertainment District. It will offer one-, two-, and three-bedroom condos, in addition to two-story penthouses. Prices range from $300,000 to $4 million; pre-construction reservations are now under way.
“More than a decade after delivering our first Miami tower we’re proud to be building our firm’s largest and most luxurious condo development to date,” Carlos Melo, a principal with the Melo Group, told Architecture Lab. “With the momentum building in the Arts & Entertainment District, Aria on the Bay will offer residents the opportunity to enjoy a walkable, family-friendly neighborhood surrounded by world-class cultural attractions.”
Aria on the Bay will be Melo Group's 14th tower in the greater Miami area.
Residents will enjoy private elevator access, floor-to-ceiling glass, spacious terraces, open-plan living areas, European-style kitchens, and custom cabinets.
The 14th floor will house a resort amenity deck with two curved lap pools featuring sunrise and sunset views, a children's pool, a hot tub, and a lounge area with fire pits, grills, and outdoor summer kitchens. In addition, Aria on the Bay will have 40,000 sf of commercial space in the lower floors, including office, retail, and restaurant space at the ground level.
Renderings courtesy of Arquitectonica and Melo Group.
Related Stories
Office Buildings | Mar 21, 2024
BOMA updates floor measurement standard for office buildings
The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.
Healthcare Facilities | Mar 18, 2024
A modular construction solution to the mental healthcare crisis
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.
Codes and Standards | Mar 18, 2024
New urban stormwater policies treat rainwater as a resource
U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.
Plumbing | Mar 18, 2024
EPA to revise criteria for WaterSense faucets and faucet accessories
The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm).
MFPRO+ New Projects | Mar 18, 2024
Luxury apartments in New York restore and renovate a century-old residential building
COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street.
Multifamily Housing | Mar 18, 2024
YWCA building in Boston’s Back Bay converted into 210 affordable rental apartments
Renovation of YWCA at 140 Clarendon Street will serve 111 previously unhoused families and individuals.
Healthcare Facilities | Mar 17, 2024
5 criteria to optimize medical office design
Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.
Construction Costs | Mar 15, 2024
Retail center construction costs for 2024
Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.
Architects | Mar 15, 2024
4 ways to streamline your architectural practice
Vessel Architecture's Lindsay Straatmann highlights four habits that have helped her discover the key to mastering efficiency as an architect.
Healthcare Facilities | Mar 15, 2024
First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care
Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.