flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

See who's attending BD+C's Under 40 Leadership Summit in SF

See who's attending BD+C's Under 40 Leadership Summit in SF

The list of AEC firms participating in our 3rd Annual Under 40 Leadership Summit continues to grow.


By BD+C Staff | September 24, 2013

There's still time to register for our 3rd Annual Under 40 Leadership Summit, October 9-11 in San Francisco.

The list of AEC firms participating in this year's event continues to grow. The following companies are sending at least one of their rising stars to the Summit (many are sending multiple people): 

 

 

Autodesk
Balfour Beatty
CTA Inc.
Esken + Dumez + Ripple
Gensler
HDR
Hill International
HMC Architects
hnedak bobo group
Jacobs Global Buildings
JE Dunn
KLMK Group
Level 10 Construction
Manhattan Construction
Martin/Martin
NTD
PHX Architecture
SmithGroupJJR
Southland Industries
SSOE Group
Stantec
Swinerton
Teabuild
Walter P Moore

If you know of up-and-coming leaders at your firm, please pass the U40 Leadership Summit registration link on: http://www.bdcnetwork.com/Under40Summit/index.html. 

Attendees can earn up to 10.5 AIA CES Learning Units and participate in exclusive tours of Autodesk Gallery and the Mission Bay/UCSF Science & Technology-Healthcare-Mixed Use District.

PLUS, the Summit’s Vision U40 Competition, to be facilitated by Autodesk Fellow Tom Wujec (see his video at www.BDCnetwork.com/under40summit), will group Summiteers into teams to develop advanced concepts to solve major societal and global problems in eight categories: Access + Mobility, Aesthetics + Beauty, Climate Change + Environment, Food Equity, Human Health + Performance, Human Spirit + Quality of Life, Social Justice, and Technological Innovation. The winning team will share the $3,000 Vision U40 Prize and four runner-up teams will each share $500.

For the special rate of $195, register by September 27 (using code U40SF) at www.BDCnetwork.com/under40summit.

Related Stories

Multifamily Housing | Mar 24, 2023

Coastal multifamily developers, owners expect huge jump in insurance costs

In Texas and Florida, where Hurricane Ian caused $50 billion in damage last year, insurance costs are nearly 50% higher than in 2022.

Multifamily Housing | Mar 24, 2023

Average size of new apartments dropped sharply in 2022

The average size of new apartments in 2022 dropped sharply in 2022, as tracked by RentCafe. Across the U.S., the average new apartment size was 887 sf, down 30 sf from 2021, which was the largest year-over-year decrease.

Government Buildings | Mar 24, 2023

19 federal buildings named GSA Design Awards winners

After a six-year hiatus, the U.S. General Services Administration late last year resumed its esteemed GSA Design Awards program. In all, 19 federal building projects nationwide were honored with 2022 GSA Design Awards, eight with Honor Awards and 11 with Citations.

Transportation & Parking Facilities | Mar 23, 2023

Amsterdam debuts underwater bicycle parking facility that can accommodate over 4,000 bikes

In February, Amsterdam saw the opening of a new underwater bicycle parking facility. Located in the heart of the city—next to Amsterdam Central Station and under the river IJ (Amsterdam’s waterfront)—the facility, dubbed IJboulevard, has parking spots for over 4,000 bicycles, freeing up space on the street.

Healthcare Facilities | Mar 22, 2023

New Jersey’s new surgical tower features state’s first intraoperative MRI system

Hackensack (N.J.) University Medical Center recently opened its 530,000-sf Helena Theurer Pavilion, a nine-story surgical and intensive care tower designed by RSC Architects and Page. The county’s first hospital, Hackensack University Medical Center, a 781-bed nonprofit teaching and research hospital, was founded in 1888.

Project + Process Innovation | Mar 22, 2023

Onsite prefabrication for healthcare construction: It's more than a process, it's a partnership

Prefabrication can help project teams navigate an uncertain market. GBBN's Mickey LeRoy, AIA, ACHA, LEED AP, explains the difference between onsite and offsite prefabrication methods for healthcare construction projects.

Geothermal Technology | Mar 22, 2023

Lendlease secures grants for New York’s largest geothermal residential building

Lendlease and joint venture partner Aware Super, one of Australia’s largest superannuation funds, have acquired $4 million in support from the New York State Energy Research and Development Authority to build a geoexchange system at 1 Java Street in Brooklyn. Once completed, the all-electric property will be the largest residential project in New York State to use a geothermal heat exchange system.

Women in Design+Construction | Mar 21, 2023

Two leading women in construction events unite in 2023

The new Women in Residential + Commercial Construction Conference (WIR+CC) will take place in Nashville, Tenn., October 25-27, 2023. Combining these two long-standing events aligns with our mission to create an event most impactful for women in the $1.4 trillion U.S. commercial and residential design and construction industry.

Mass Timber | Mar 19, 2023

A 100% mass timber construction project is under way in North Carolina

An office building 100% made from mass timber has started construction within the Live Oak Bank campus in Wilmington, N.C. The 67,000-sf structure, a joint building venture between the GCs Swinerton and Wilmington-headquartered Monteith Construction, is scheduled for completion in early 2024.

Sports and Recreational Facilities | Mar 17, 2023

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

In January, design firm Populous and the City of Aurora, Colo. marked the opening of the Southeast Aurora Recreation Center and Fieldhouse. The 77,000-sf facility draws design inspiration from the nearby Rocky Mountains. With natural Douglas Fir structure and decking, the building aims to mimic the geography of a canyon. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021