The Shedd Aquarium has unveiled its strategic vision for the next 100 years. The vision, dubbed the Centennial Commitment due to the organization’s 100th anniversary in 2030, is aimed at ensuring a more equitable, sustainable, and thriving future for people and aquatic life.
The Centennial Commitment centers around three primary pillars - For People, For Communities, and For Aquatic Life. These pillars include:
- Deeper community investments and partnerships
- A modernized aquarium experience through the transformation and restoration of the historic galleries and dynamic new exhibits that provide greater and more accessible entry points
- New educational and experiential programs
- Digital engagements that bring animals and conservation action programs from the aquarium into more hands and homes
- Advancements in animal care and welfare
- Accelerated aquatic research and science
Half of the $500 million budget will power the programs and partnerships needed to achieve the Centennial Commitment’s aspirations while the other half will focus on the needed physical improvements to the historic Beaux-Arts-style building that will modernize the aquarium galleries and experience, enable greater accessibility, enhance animal habitats, and restore architectural features such as the opening of original windows that provide views of the Chicago skyline and Lake Michigan and unobstructed public access to the building’s original exterior promenade and garden spaces.
The multi-year, four phase construction project will begin in late 2022. Project highlights include:
- A modernized experience that will feature more accessible, interactive, highly immersive, and science-rich galleries
- A new learning commons located at the historic core of the aquarium on the main level that will serve as a launchpad and increase the amount of existing classroom space
- A centralized science hub that will merge five existing scientific laboratories into one central hub spanning microbial ecology, conservation science, water quality and chemistry, genome studies, and pathology
- New circulation pathways that will significantly reduce the number of transitions between areas of the aquarium, allowing guests to have multiple options regarding where they can start their journey and making navigation easier.
- Four acres of activated outdoor green space around the building that will increase natural connections to nature and bolster resilience on the lakefront while also adding experiential blue and environmental improvements.
The modernization of the historic galleries will serve as the largest capital project for the organization in recent history, preceded by the expansion of the Abbott Oceanarium in 1991 (and its reimagination in 2008), Amazon Rising exhibit in 2001, and Wild Reef exhibit in 2003.
The build team will include Pepper/BMI Construction (general contractor partners), Valerio Dewalt Train (architect), Thinc Design (exhibit design partner), JLL (project manager), Institute for Human Centered Design (accessibility partner), and Trinal (equity and inclusion partner).
Construction is slated to conclude in 2026 with new galleries, programs, and experiences opening each year on a rolling basis.
Related Stories
| May 23, 2014
Big design, small package: AIA Chicago names 2014 Small Project Awards winners
Winning projects include an events center for Mies van der Rohe's landmark Farnsworth House and a new boathouse along the Chicago river.
| May 22, 2014
IKEA to convert original store into company museum
Due to open next year, the museum is expected to attract 200,000 people annually to rural Älmhult, Sweden, home of the first ever IKEA store.
| May 21, 2014
Gehry unveils plan for renovation, expansion of Philadelphia Museum of Art [slideshow]
Gehry's final design reorganizes and expands the building, adding more than 169,000 sf of space, much of it below the iconic structure.
| May 20, 2014
Kinetic Architecture: New book explores innovations in active façades
The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 15, 2014
First look: 9/11 Memorial Museum opens to first-responders, survivors, 9/11 families [slideshow]
The 110,000-sf museum is filled with monumental artifacts from the tragedy and exhibits that honor the lives of every victim of the 2001 and 1993 attacks.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 13, 2014
Libeskind wins competition to design Canadian National Holocaust Monument
A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.