flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska hires first Director of Mass Timber & Prefabrication

Contractors

Skanska hires first Director of Mass Timber & Prefabrication

Seattle native Dean Lewis brings expertise as interest in mass timber in construction grows.


By Skanska USA | March 17, 2023
Skanska hires first Director of Mass Timber & Prefabrication
Lewis will be responsible for the company’s work on prefabrication and mass timber projects across the United States, furthering the scope and quality of Skanska’s mass timber builds.

Global construction and development firm Skanska USA has hired Dean Lewis as its first Director of Mass Timber & Prefabrication. Lewis, who will be based in his native Seattle, comes to Skanska with 13 years of experience in mass timber and engineering roles in Washington and California. 

Lewis will be responsible for the company’s work on prefabrication and mass timber projects across the United States, furthering the scope and quality of Skanska’s mass timber builds, and consulting on business development efforts around mass timber projects. 

“Dean’s hiring supports Skanska’s commitment to mass timber construction, as use of the material increases in the industry,” said Lew Guerrette, executive vice president and general manager, Skanska USA Building in Seattle. “In addition to the enhanced aesthetics, the use of mass timber helps our clients achieve their sustainability goals while reducing construction time and costs. Dean’s expertise, passion, and management experience will make him an invaluable mass timber advisor to our teams and clients.” 

Before joining Skanska, Lewis was with Alphabet-funded Sidewalk Labs for two years, working on new construction technologies in the mass timber space. He has also worked for Swinerton Mass Timber (Timberlab) (2019-2021), DCI Engineers (2010-2019) and the U.S. Army Corps of Engineers (2009-2010).

During his career, Lewis has overseen multiple mass timber construction projects including office buildings, campus dorms, multi-family developments, and hotels. He has an extensive experience with design and fabrication, project management and delivery, logistics, procurement, among other aspects of the construction process. He has also been part of published research projects within the mass timber space.

Lewis graduated from Washington State University (WSU) where he earned a Bachelor of Science in Civil Engineering and a Master of Science in Structural Engineering. At WSU, he studied under Dr. J. Daniel Dolan, P.E., a premier figure in the mass timber industry, who inspired him to pursue a career in the field. Lewis is following a similar career path to his father, who worked in construction, and his grandfather, an architect.  

About Skanska
Skanska uses knowledge & foresight to shape the way people live, work, and connect. More than 135 years in the making, we’re one of the world’s largest development and construction companies. We operate in select markets throughout the Nordics, Europe and the United States. Skanska in the U.S. is headquartered in New York City with 29 offices around the country. In 2022, construction in the U.S. generated $6.9 billion in revenue, and as a developer in the U.S., Skanska has invested a total of $3.5 billion in commercial and multi-family projects. Together with our customers and the collective expertise of our 6,500 teammates in the U.S. and 28,000 globally, we create innovative and sustainable solutions that support healthy living beyond our lifetime. 

Related Stories

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021