flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska hires first Director of Mass Timber & Prefabrication

Contractors

Skanska hires first Director of Mass Timber & Prefabrication

Seattle native Dean Lewis brings expertise as interest in mass timber in construction grows.


By Skanska USA | March 17, 2023
Skanska hires first Director of Mass Timber & Prefabrication
Lewis will be responsible for the company’s work on prefabrication and mass timber projects across the United States, furthering the scope and quality of Skanska’s mass timber builds.

Global construction and development firm Skanska USA has hired Dean Lewis as its first Director of Mass Timber & Prefabrication. Lewis, who will be based in his native Seattle, comes to Skanska with 13 years of experience in mass timber and engineering roles in Washington and California. 

Lewis will be responsible for the company’s work on prefabrication and mass timber projects across the United States, furthering the scope and quality of Skanska’s mass timber builds, and consulting on business development efforts around mass timber projects. 

“Dean’s hiring supports Skanska’s commitment to mass timber construction, as use of the material increases in the industry,” said Lew Guerrette, executive vice president and general manager, Skanska USA Building in Seattle. “In addition to the enhanced aesthetics, the use of mass timber helps our clients achieve their sustainability goals while reducing construction time and costs. Dean’s expertise, passion, and management experience will make him an invaluable mass timber advisor to our teams and clients.” 

Before joining Skanska, Lewis was with Alphabet-funded Sidewalk Labs for two years, working on new construction technologies in the mass timber space. He has also worked for Swinerton Mass Timber (Timberlab) (2019-2021), DCI Engineers (2010-2019) and the U.S. Army Corps of Engineers (2009-2010).

During his career, Lewis has overseen multiple mass timber construction projects including office buildings, campus dorms, multi-family developments, and hotels. He has an extensive experience with design and fabrication, project management and delivery, logistics, procurement, among other aspects of the construction process. He has also been part of published research projects within the mass timber space.

Lewis graduated from Washington State University (WSU) where he earned a Bachelor of Science in Civil Engineering and a Master of Science in Structural Engineering. At WSU, he studied under Dr. J. Daniel Dolan, P.E., a premier figure in the mass timber industry, who inspired him to pursue a career in the field. Lewis is following a similar career path to his father, who worked in construction, and his grandfather, an architect.  

About Skanska
Skanska uses knowledge & foresight to shape the way people live, work, and connect. More than 135 years in the making, we’re one of the world’s largest development and construction companies. We operate in select markets throughout the Nordics, Europe and the United States. Skanska in the U.S. is headquartered in New York City with 29 offices around the country. In 2022, construction in the U.S. generated $6.9 billion in revenue, and as a developer in the U.S., Skanska has invested a total of $3.5 billion in commercial and multi-family projects. Together with our customers and the collective expertise of our 6,500 teammates in the U.S. and 28,000 globally, we create innovative and sustainable solutions that support healthy living beyond our lifetime. 

Related Stories

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021