Trimble has released SketchUp 2014, the latest version of its popular 3-D modeling platform for architects, engineers, design and construction professionals, as well as members of the global maker community.
SketchUp 2014 features major enhancements to SketchUp’s 3-D Warehouse—the world’s largest repository of free, high-quality, 3-D content—as well as new tools that improve the classification of design objects, tighten interoperability with other products used in Building Information Modeling (BIM) workflows, and make professional documentation more efficient.
“As SketchUp’s professional footprint expands, access to content and broad interoperability are vital issues to our customers," said Chris Keating, director of the Architecture Division within the Trimble Buildings Group. "With SketchUp 2014, we’re giving users better tools to easily access the models they need and to ensure those models add value throughout the information modeling process.”
New 3-D Warehouse: Where Content is King
SketchUp’s 3-D Warehouse is an online repository for finding, storing and sharing useful 3-D models. In SketchUp 2014, the 3-D Warehouse has been rebuilt, making it easier for users to quickly find the models they need, create and organize their own collections, and share them with the world.
- The new 3-D Warehouse now features an integrated WebGL viewer, enabling users to preview and orbit models in full 3-D before downloading them into their own projects.
- Users can now upload 3-D models directly from their Web browsers, without first opening them in SketchUp, while the maximum size of uploadable models has been increased from 10 to 50 megabytes.
- The new Product Catalogs feature speeds the task of finding specific manufacturers’ products—from windows to washing machines—letting users start their models with the exact items they intend to use.
Building upon SketchUp Pro’s Information Modeling Foundation
Since BIM is an increasingly important process for professionals in architecture, engineering and construction, Trimble has expanded SketchUp Pro’s interoperability with other commonly used tools and data. The new release provides an easier way for users to participate in the information modeling process by ensuring that their objects and models—and the data connected to them—remain consistently identifiable throughout the BIM workflow.
SketchUp Pro 2014 contains three new features that are specific to information modeling:
- IFC Export: since the information embedded in information models is often used by other software programs, SketchUp Pro 2014 now includes another important industry standard to its roster of supported exports—the IFC 2x3 file type.
- Classifier: this feature allows users to classify objects with the pre-loaded IFC classification, use alternate classification types, or create a customized system for their specific needs.
- Component Options: provides editable options relevant to an object’s classified type, allowing pertinent data about each object to be managed throughout the information modeling process.
“BIM workflows are often complex and rigid processes, and we believe they don’t need to be,” said John Bacus, director of SketchUp product management at Trimble. “With this new release, we are enabling users to participate more effectively at any point in the information modeling process. We’ve added simple tools for adding structured information to a model in a way that is helpful to SketchUp customers, allowing them to easily pass information to others on their project teams, regardless of the tools being used.”
Documentation Done Right
Professional users will also benefit from continued enhancements to the 2-D documentation capabilities in SketchUp Pro 2014, such as: auto tags to improve accuracy and reduce repetitive work, smart labels with pre-populated relevant text, and significant improvements in speed for vector-rendered model views.
SketchUp 2014 is available now. Additional information and downloads are available at: www.sketchup.com.
Related Stories
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: Walsh Group Training and Conference Center, Chicago, Ill.
With its Building Team partners—architect Solomon Cordwell Buenz, structural engineer CS Associates, and M/E engineer McGuire Engineers—Walsh Construction, acting as its own contractor, turned the former automobile showroom and paperboard package facility into a 93,000-sf showcase of sustainable design and construction.
| Oct 5, 2012
2012 Reconstruction Award Silver Winner: 220 Water Street, Brooklyn, N.Y.
The recent rehabilitation of 220 Water Street transforms it from a vacant manufacturing facility to a 134-unit luxury apartment building in Brooklyn’s DUMBO neighborhood.
| Oct 5, 2012
2012 Reconstruction Award Silver Winner: Residences at the John Marshall, Richmond, Va.
In April 2010, the Building Team of Rule Joy Trammell + Rubio, Stanley D. Lindsey & Associates, Leppard Johnson & Associates, and Choate Interior Construction restored the 16-story, 310,537-sf building into the Residences at the John Marshall, a new mixed-use facility offering apartments, street-level retail, a catering kitchen, and two restored ballrooms.
| Oct 4, 2012
2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio
The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.
Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Rice Fergus Miller Office & Studio, Bremerton, Wash.
Rice Fergus Miller bought a vacant and derelict Sears Auto and converted the 30,000 gsf space into the most energy-efficient commercial building in the Pacific Northwest on a construction budget of around $100/sf.
| Oct 4, 2012
2012 Reconstruction Award Platinum Winner: Building 1500, Naval Air Station Pensacola Pensacola, Fla.
The Building Team, led by local firms Caldwell Associates Architects and Greenhut Construction, had to tackle several difficult problems to make the historic building meet current Defense Department standards having to do with anti-terrorism, force protection, blast-proofing, and progressive collapse.
| Oct 4, 2012
2012 Reconstruction Awards Platinum Winner: City Hall, New York, N.Y.
New York's City Hall last received a major renovation nearly a century ago. Four years ago, a Building Team led by construction manager Hill International took on the monumental task of restoring City Hall for another couple of hundred years of active service.
| Oct 4, 2012
BD+C's 29th Annual Reconstruction Awards
Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.
| Oct 4, 2012
Electronic power tool builds project transparency
As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.