flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM launches Los Angeles design studio

SOM launches Los Angeles design studio

Expert team to join the firm's West Coast practice, focusing on innovative urban and environmentally sustainable design in Southern California.


By By BD+C Staff | January 17, 2012
This article first appeared in the February 2012 issue of BD+C.

The partners of Skidmore, Owings & Merrill LLP (SOM) announced they are launching a new design studio as part of their West Coast practice. Leading the new studio are three former SOM architects: Michael Mann, FAIA; Paul Danna, AIA; and Jose Luis Palacios, AIA. 

Mann's career began at SOM and he has worked on significant Los Angeles-based projects including SOM's Gas Company Tower. He has directed and managed major domestic and international projects throughout his 30-year career and he will serve as L.A. Practice Leader/Management for SOM's Los Angeles design studio.

Danna's connection to SOM began when he won the SOM Foundation Traveling Fellowship upon graduation from Harvard's GSD program. His two-decade career includes diverse, highly recognized and award-winning projects including numerous LEED Gold-certified buildings. He is a leader in the Los Angeles design community and has served as President of AIA|LA and he is on the Board of the Architectural Guild of the University of Southern California's School of Architecture. 

Palacios' career began at SOM. His work entails a broad range of building types including the design of civic, government and public safety complexes. His work includes the recently completed LAPD Headquarters and he has designed stations for the California High Speed Rail project. Jose has most recently taught at the University of Southern California School of Architecture. He will work as L.A. Practice Leader/Design for SOM's Los Angeles studio.

SOM's presence in Southern California - until recently driven by the firm's San Francisco office - includes significant new commissions such as UCLA's new Medical Education Building which will become a new front door for the campus and the Medical School; a new mixed-use project at UC Santa Barbara and a new courthouse for the Superior Court of California in San Diego which will be the State's largest. These projects are directly in line with the firm's commitment to urban, environmental and social sustainability. BD+C

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 4, 2011

GREENBUILD 2011: Ready-to-use wood primer unveiled

Maintains strong UV protection, clarity even with application of lighter, natural wood tones.

| Oct 4, 2011

GREENBUILD 2011: Two new recycled glass products announced

The two collections offer both larger and smaller particulates. 

| Oct 4, 2011

GREENBUILD 2011: Mythic Paint launches two new paint products

A high performance paint, and a combination paint and primer now available. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021