flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

Mixed-Use

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.


By David Malone, Managing Editor | July 16, 2021
SOM Olympic Village aerial
SOM Olympic Village aerial

Following an international competition that featured 27 groups comprised of 71 studios from nine different countries, SOM has been selected to design the Olympic Village for the 2026 Milan-Cortina Olympics.

The new Olympic Village will transform the Porta Romana district, creating a sustainable urban community and offer a new model for Olympic facilities to serve post-Olympic social goals. The village encompasses a set of public green spaces, the transformation of two historic structures, and six new mass timber residential buildings that will serve Olympic athletes in the short term.

 

SOM Olympic Village

 

After the Olympics, the athletes homes will be reused for student housing; the park and railway side buildings near the Olympic Square will be used for affordable housing; and the Olympic Village Plaza will become a neighborhood square with shops, bars, restaurants, and cafes planned at street level, along with outdoor space for farmers’ markets and other community events.

“Rather than ceasing to be of use after the Olympics, the Porta Romana Olympic Village will ultimately become a vibrant, self-sustaining neighborhood built around the principles of social equity, environmental commitment, wellness, and inclusivity,” said SOM Design Partner Colin Koop, in a release. “The village adopts the rhythm of the area’s streetscape, creating a porous urban block with a variety of public spaces and communal anchors that will enhance Milan’s vibrant tapestry of ground floor experiences.”

 

SOM Olympic Village square

 

The new buildings take architectural inspiration from the historic buildings of Milan, featuring contemporary materials and communal terraces. Shaded by vertical plantings, these terraces serve as bridges between the buildings, becoming signature gathering spaces and outdoor study rooms for students. The integration of greenery within the outdoor areas will contribute to the neighborhood’s climate resilience while also creating space for urban farms that enable on-site for production.

 

SOM retail/cafe

 

The village’s mechanical systems will tie in to the precinct’s loops, with passive cooling strategies, solar panels, and rooftop gardens ensuring more than 30% of the energy used will be produced on site. Stormwater will be collected on site and reused, with a reduction in the use of drinking water by 50% and CO2 reduction of 40% for heating and cooling. The village will target minimal environmental impact in accordance with Nearly Zero Energy Building requirements.

Construction of the Olympic Village is slated to be completed by July 2025.

 

SOM Olympic Village terraces

Tags

Related Stories

Mixed-Use | Apr 16, 2021

Wrigleyville Lofts to bring 120 apartment units to Chicago’s Wrigleyville neighborhood

The project will also include 14,000 sf of ground floor retail.

Mixed-Use | Apr 8, 2021

New mixed-use development under construction at Naperville’s CityGate Centre

The project will comprise 285 multifamily units and the shell for a future event center.

Mixed-Use | Apr 7, 2021

New mixed-use rental community breaks ground in Chicago’s Bronzeville neighborhood

The building marks the latest phase of the Oakwood Shores revitalization plan.

Mixed-Use | Mar 22, 2021

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.

Mixed-Use | Mar 9, 2021

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.

Mixed-Use | Mar 8, 2021

Chicago’s South Side to receive new Entrepreneurial and Community Hub

SOM and TnS Studio will lead the design.

Mixed-Use | Feb 24, 2021

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.

Mixed-Use | Feb 22, 2021

Mixed-use development will occupy former manufacturing industrial site near the Chicopee River

Paul A. Castrucci Architects is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021