flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

SOM's twisting tower wins design competition for Sweden's tallest skyscraper

The 230-meter tower scheme beat out four other finalists, including Zaha Hadid.


By BD+C Staff | June 18, 2014
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg,
The tower, called Polstjrnan, or "The Pole Star," is to be built in Gothenburg, Sweden. Renderings courtesy SOM

The winner of Serneke's competition to design Sweden's tallest skyscraper has been announced. Skidmore, Owings & Merrill beat out four other finalists, including Zaha Hadid. 

The skyscraper, which will reach 230 meters and is named Polstjärnan, or "The Pole Star," is to be built in Gothenburg, Sweden.

With a 32,000-sm master plan, it will be wholly residential. At its apex, the tower will have four connected prisms, which twist 90 degrees, Arch Daily reports.

When discussing why the design won, the jury cited the plan's harmony with the larger city, calling SOM's design “an identity-building proposal that takes a smart holistic approach to both the skyscraper and the urban environment."

In addition, the jury stated the the project simply made sense economically, while providing comfortable living spaces: "The repetitive structure makes the building easy to produce cost-effectively. The homes are well-composed, with good views and good outdoor spaces in all directions. Overall, the proposal is successful in its endeavor to create an attractive urban setting and a visually striking superstructure." You can read the jury's full statement here.

The high-rise building is expected to be completed by 2019 and is the centerpiece of a new, 200,000-sm mixed-use city due to be fully completed in 2012, to celebrate Gothenburg's 400th anniversary.

All renderings courtesy SOM.

 

 

The jury consisted of:

Björn Siesjö, architect SAR/MSA City Architect Stadsbyggnadskontoret Göteborg
Anders Svensson, architect SAR/MSA, the Älvstad Project Stadsbyggnadskontoret Göteborg
Olle Lindkvist, Älvstranden Utvecklings AB
Erica Bengtsson, Environmental Strategist, Älvstranden Utvecklings AB
Ola Serneke, VD Serneke AB
Alban Herlitz, Project Development Manager Serneke AB
Louise Masreliez, architect SAR/MSA appointed by Sveriges Arkitekter
Christer Malmström, architect SAR/MSA appointed by Sveriges Arkitekter

Related Stories

MFPRO+ News | Jul 22, 2024

6 multifamily WAFX 2024 Prize winners

Over 30 projects tackling global challenges such as climate change, public health, and social inequality have been named winners of the World Architecture Festival’s WAFX Awards.

Office Buildings | Jul 22, 2024

U.S. commercial foreclosures increased 48% in June from last year

The commercial building sector continues to be under financial pressure as foreclosures nationwide increased 48% in June compared to June 2023, according to ATTOM, a real estate data analysis firm.

Codes and Standards | Jul 22, 2024

Tennessee developers can now hire their own building safety inspectors

A new law in Tennessee allows developers to hire their own building inspectors to check for environmental, safety, and construction violations. The law is intended to streamline the building process, particularly in rapidly growing communities.

Codes and Standards | Jul 22, 2024

New FEMA rules include climate change impacts

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk. For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year.

Construction Costs | Jul 18, 2024

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 

Sustainability | Jul 18, 2024

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.

University Buildings | Jul 17, 2024

University of Louisville Student Success Building will be new heart of engineering program

A new Student Success Building will serve as the heart of the newly designed University of Louisville’s J.B. Speed School of Engineering. The 115,000-sf structure will greatly increase lab space and consolidate student services to one location.

Healthcare Facilities | Jul 16, 2024

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

K-12 Schools | Jul 15, 2024

A Cleveland suburb opens a $31.7 million new middle school and renovated high school

Accommodating 1,283 students in grades 6-12, the Warrensville, Ohio school complex features flexible learning environments and offers programs ranging from culinary arts and firefighting training to e-sports.

MFPRO+ News | Jul 15, 2024

More permits for ADUs than single-family homes issued in San Diego

Popularity of granny flats growing in California

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021