In Culver City, Calif., Del Amo Construction, a construction company based in Southern California, has completed the adaptive reuse of 3516 Schaefer St, a new office property. 3516 Schaefer is located in Culver City’s redeveloped Hayden Tract neighborhood, a former industrial zone that has become a technology and corporate hub. In March, Los Angeles Business Journal gave 3516 Schaefer St the top Gold award in the commercial office category.
Owned by Redcar Ltd. and designed by RAC Design Build, with contract administration services from Formation Association, the three-floor property consists of about 25,000 sf of office and amenity spaces. In addition to 18-foot-high floors, the building’s features include a mix of open-floor work areas and conference rooms, a second-floor break room with kitchen space, a third-floor mezzanine area, private patios, outdoor decks on all floors, and a secured parking lot.
Originally, the project site included an existing single-story building that Del Amo Construction removed, as well as a crane-rail steel structure that was modified and incorporated into the new building. The new space, which is adjacent to Redcar’s two-story 3520 Schaefer St, provides an airy, low-rise structure with indoor-outdoor features, a sloping roof line, and an exterior of metal, glass, concrete, and wood.
3516 Schaefer St’s sustainable and energy-efficient components include custom steel windows and doors fabricated to allow for fresh air and ventilation, roof solar panels with a fully integrated photovoltaic system, variable refrigerant flow (VFR) HVAC, EnergyStar appliances, programmable Lutron lighting, three fully operational EV charging stations with eight additional pre-installed locations, bicycle parking, a stormwater capturing drywell system, and drought-tolerant landscaping.
On the Building Team:
Owner/developer: Redcar Ltd.
Design architect and architect of record: RAC Design Build
MEP engineer: AMA Consulting Engineering
Structural engineer: Glotman Simpson
General contractor: Del Amo Construction
Related Stories
Office Buildings | Apr 28, 2021
The Salvation Army’s National Headquarters renovation completes
HGA designed the project.
Steel Buildings | Apr 17, 2021
Speed Core wall system is used for the second time in office building in San Jose
The construction method is expected to knock off three months from the project’s schedule.
Office Buildings | Apr 15, 2021
JetBrains St. Petersburg campus to include large, vertically stepped indoor atrium
UNStudio is designing the project.
Office Buildings | Apr 12, 2021
A Fort Myers, Fla., developer finds growth in an office sector that, post COVID, might be catching its second wind
Seagate Development Group has several office projects near completion.
Office Buildings | Apr 7, 2021
Thyssenkrupp’s new HQ will include the tallest elevator test tower in the Western Hemisphere
The facility began construction in August of 2019.
Office Buildings | Apr 5, 2021
FXCollaborative selected to create new lobby, amenity space for 3 Times Square
FXCollaborative designed the original building in 2001.
Office Buildings | Apr 5, 2021
Innovation One completes at University Research Park in Madison, Wis.
Valerio Dewalt Train designed the project.
Office Buildings | Mar 30, 2021
WELL Institute certifies a gigantic office complex with its highest health and safety rating
Poland’s Olivia Business Center one of the first to install ion air purification devices.
Office Buildings | Mar 26, 2021
Finding success for downtown office space after COVID-19
Using the right planning tools can spur new uses for Class B and C commercial real estate.
Office Buildings | Mar 24, 2021
JEA Headquarters tops out in Jacksonville
The building has recently topped out.