flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Specification for field testing newly installed storefronts, curtain walls, sloped glazing systems updated

Codes and Standards

Specification for field testing newly installed storefronts, curtain walls, sloped glazing systems updated

The specification is used to verify air infiltration resistance performance and water penetration resistance.


By Peter Fabris, Contributing Editor | May 10, 2024
Image by wal_172619 from Pixabay
Image by wal_172619 from Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a specification establishing requirements for field testing newly installed storefronts, curtain walls, and sloped glazing systems.

AAMA 503-24, Voluntary Specification for Field Testing of Newly Installed Storefronts, Curtain Walls and Sloped Glazing Systems establishes the requirements for field test specimens, apparatus, sampling, test procedures and test reports to be used in verifying the air infiltration resistance performance and/or water penetration resistance performance of newly installed fenestration products.

The Testing Criteria of Commercial Fenestration Updates Task Group completed a full technical review of the specification for the new edition. A new section about significance and use was added. Sections addressing sampling, site preparation, and responsible parties were expanded. The section on test procedures was also revised, clarifying that air leakage resistance testing under AAMA 503 is optional. Definitions of water penetration were also updated.

“When used as part of a comprehensive building commissioning program, AAMA 503 provides reasonable assurance that the installed fenestration products will perform to the specified or rated air leakage and/or water penetration performance levels with allowances given for field performance,” says Jason Seals, FGIA certification services manager, fenestration.

Related Stories

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Mar 7, 2018

Dept. of Energy says 2016 ANSI/ASHRAE/IES Standard 90.1 would save 8.2% of energy costs

Favorable comparison to 2013 standard for commercial buildings.

Codes and Standards | Mar 6, 2018

Well Living Lab launches extensive study on how indoor environments affect people’s lives

Factors that impact health, performance, stress and resiliency, sleep, and comfort to be scrutinized.

Codes and Standards | Mar 5, 2018

New guide helps planners assess innovation districts

The document is designed to aid in targeting resources toward innovative and inclusive economic development based on an area’s unique strengths and challenges.

Codes and Standards | Mar 1, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Feb 27, 2018

Smart surface solutions can improve disaster resilience, health and comfort in cities

Stormwater management, water quality, and heat island effect could all be impacted.

Codes and Standards | Feb 26, 2018

Bolstering energy efficiency would produce significant health benefits, ACEEE study says

Reducing energy consumption by 15% would save six lives a day.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021