Springdale Green, a new office campus comprising two six-story office buildings totaling 872,500 rentable sf, has been granted approval in East Austin.
The Gensler-designed project will include extensive outdoor amenities and state-of-the-art infrastructure to create a work setting focused on sustainability and wellness. The campus offers a new way of working with multiple outdoor areas, an 18,000-sf flex/conference space with a dedicated outdoor patio, and a 23,000-sf fitness and wellness center that is exclusive to campus employees. An onsite parking garage will support multiple modes of transportation including indoor storage for 308 bikes and 46 electric vehicle charging stations, with the ability to expand to a total of 345 charging stations.
The office buildings will combine to feature 36,000 sf of signature terraces that create a garden-like extension of the interior. The fitness center will offer classes and personal training such as yoga, bootcamp, basketball, and volleyball. It will also directly connect to outdoor amenities such as nearly a mile of boardwalk, a jogging loop, and nature trails.
A little of two-thirds of the 30-acre campus will be preserved and restored with native meadows, woodland and plantings, and an urban creek tributary. A 600,000-gallon underground cistern will capture and store rainwater, as well as harvest air conditioning condensate that will then be used to irrigate the landscape. The site’s stormwater will be treated and cleaned using rain gardens and a bio-retention basin that will help prevent downstream flooding.
The project is targeting LEED Gold and Austin Energy Green Building 3-Star.
Related Stories
| Jul 1, 2013
LEGOLAND builds 12-foot replica of One World Trade Center
The LEGOLAND Discovery Center Westchester in Yonkers, N.Y., celebrated the completion of a LEGO replica of One World Trade Center by lighting the 12-foot-tall, 100-pound model.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 18, 2013
Report: HVAC occupancy sensors could slash building energy demand by 18%
Researchers at the DOE's Pacific Northwest National Laboratory conclude that significant energy savings can be achieved by varying ventilation levels based on the number of people in a given space.
| Jun 17, 2013
First look: Austin to get first high-rise since 2003
Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.
| Jun 17, 2013
DOE launches database on energy performance of 60,000 buildings
The Energy Department today launched a new Buildings Performance Database, the largest free, publicly available database of residential and commercial building energy performance information.
| Jun 13, 2013
7 great places that represent excellence in environmental design
An adaptive reuse to create LEED Platinum offices, a park that honors veterans, and a grand national plaza are among the seven projects named winners of the 2013 Great Places Awards. The Environmental Design and Research Association recognize professional and scholarly excellence in environmental design, with special attention paid to the relationship between physical form and human activity or experience.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.
| Jun 6, 2013
Get smart about space utilization in the workplace
As we continue to look for more effective ways to improve the overall workplace experience, one tool we can use is measuring and analyzing space utilization.