SSOE Group, an internationally ranked architecture and engineering firm, is delighted to announce the successful acquisition of Santa Clara, California-based Integrated Engineering Services (IES), effective October 13, 2023. This strategic move marks a significant step forward for both organizations, ushering in a new era of expanded capabilities and enhanced service offerings for our valued clients.
IES, founded in 1995, is a distinguished engineering firm renowned for its expertise in MEP, Chemical and Process Engineering, Hazardous Materials, and Code Compliance. Additionally, IES brings highly sought-after Commissioning and Qualification services to the table, opening up this new service offering for SSOE. This acquisition strengthens SSOE's position in key markets, including Semiconductor, Pharmaceutical, Battery, Food and Beverage, Chemical, and Higher Education, where both firms are poised to provide even greater value and specialized solutions.
SSOE's CEO Vince DiPofi, PE, expressed enthusiasm for joining of the two firms, "We are excited about this opportunity and the benefits it will bring to our clients and employees. This acquisition allows us to broaden our expertise, expand our service offerings, and deepen our resources for project execution. Together, as a combined firm, we will be able to provide even more value and support to our clients." Jeremy Woodgate, PE, SE, the firm’s Chief Operating Officer, added, “SSOE and IES share a common commitment to client service and complex problem-solving, as well as a dedication to making our clients successful. IES brings impressive expertise in areas that are critical to our clients including cleanroom design, industrial and lab ventilation, specialty and toxic gas distribution piping systems, process and bulk chemical distribution systems, purity water and wastewater treatment, hazardous building codes, fire codes, and regulatory compliance and permitting.”
IES’s full team will remain with the firm, including their two co-founders Rizik Michael and Jeff Tarter. In comments on the motivation behind the deal, Tarter noted, “The cultures of our organizations align and our services complement each other. We have worked with SSOE in the past, and we are impressed by their remarkable track record of delivering large, complex projects across the United States and beyond. We are excited that our IES clients will benefit from SSOE’s comprehensive civil, facilities, and process design capabilities.”
In addition to Santa Clara, IES’s locations in Atlanta, Georgia and Austin, Texas will further bolster SSOE’s presence in these geographic regions and provide IES clients with a growing list of 20+ additional locations to support them.
Betsy Hurner, Vice President of Corporate Development at SSOE, remarked, “This acquisition demonstrates our continued focus on adding expertise through acquisitions. We want to be a go-to partner for our clients’ most complex and challenging projects and firms with impressive skillsets like IES help us make progress toward that goal. We welcome the IES team with open arms and look forward to a prosperous future together!”
About SSOE Group
As an internationally ranked architecture and engineering firm, SSOE is known for delivering unparalleled client value that advances the AEC industry. They have been named a “Great Workplace” (Great Place to Work®) and one of the “Best AEC Firms to Work For” (BD+C).
Over the company’s 75-year history, it has earned a reputation for providing quality project solutions to high-tech and general manufacturing clients in the semiconductor, automotive, battery, food, chemical, and glass industries. SSOE also provides forward-thinking design across healthcare and general building sectors such as corporate workplace, education, and judicial—with projects completed in 40 countries.
SSOE has vast experience developing engineered solutions and implementing innovative technology for complex environments. Their portfolio of work includes the 4 million SF Ford Tennessee Electric Vehicle Center, Panasonic’s 300-arce Lithium-Ion Battery Manufacturing Campus, Toyota’s Battery Cell Production Facility, and many more. Visit ssoe.com for more information.
About Integrated Engineering Services
IES is a full-service MEP design firm specializing in innovative and complex designs, chemical and process engineering services; specialized hazardous materials, code and risk management consulting; and commissioning and qualification services for the microelectronics, green tech, and life sciences industries.
Related Stories
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Feb 11, 2011
Former Richardson Romanesque hotel now houses books, not beds
The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.
| Feb 11, 2011
Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork
Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.
| Feb 11, 2011
Research facility separates but also connects lab spaces
California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.
| Feb 11, 2011
A feast of dining options at University of Colorado community center, but hold the buffalo stew
The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.
| Feb 11, 2011
Chicago high-rise mixes condos with classrooms for Art Institute students
The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.
| Feb 11, 2011
Iowa surgery center addresses both inpatient and outpatient care
The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.
| Feb 11, 2011
Grocery store anchors shopping center in Miami arts/entertainment district
18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.
| Feb 11, 2011
Chicago architecture firm planning one of China’s tallest towers
Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.