Teeple Architects, in association with Stantec, has completed the $84.5-million, 230,000-sf renovation and expansion project of the existing Edmonton Public Library (EPL) main branch into an innovative and welcoming civic hub.
Now named the Stanley A. Milner Library, the facility originally opened as Edmonton’s Centennial Library in 1967. The renovation and expansion project actively supports the library’s position as a social and creative destination at its prominent downtown location on Sir Winston Churchill Square.
The original scope of the project included replacing the building’s exterior precast panels with a new energy efficient zinc building envelope with expanses of glazing, upgrading several aging building systems, activating the civic space around the building, and creating a new architectural identity to foster greater community engagement.
The public is invited inside the building via colored skylights, glazing panels, EPL signage, and a new plaza with clear views into the library’s programming, transforming the new library into a welcoming portal between Sir Winston Churchill Square and Centennial Square.
After collaboration with EPL and the City of Edmonton the project was expanded to include a comprehensive interior renovation. Visitors enter into a bright six-story atrium defined by a new “reading ramp” and a two-story interactive display wall. Basement lobby space for the the building’s theater and event rooms is now visible through voids in the floor.
New amenities spaces include large galleria spaces, a cafe, a multi-functional children’s library, maker spaces, a gaming space, a teaching kitchen, meeting spaces, administrative offices, and the PÎYÊSÎW WÂSKÂHIKAN (Thunderbird House), an Indigenous gathering and smudging space designed in consultation with local Cree Elders and their communities.
The Shelley Milner Children’s Library nearly triples the size of the original children’s area and hosts the Gwyn Morgan & Patricia Trottier Foundation Early Literacy Centre, the Brown Family Playspace, and the Al & Fran Olson Children’s Makerspace for ages 6-12.
The Makerspace on the second floor is for ages 12 and up and encompasses 10,000 sf. It comprises 3D printers, a heat press, a vinyl cutter, a sewing and serving center, a book binding area, a fully equipped Fab Lab with a laser cutter, a computer lab, a digital conversion services center, and recording studios.
The Stanley A. Milner Library Renewal project was completed in 2020.
Related Stories
| Sep 16, 2013
Study analyzes effectiveness of reflective ceilings
Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 22, 2013
Cultural Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 18, 2013
GSA regains stature under Tangherlini, who looks to trim its holdings, cut energy costs [2013 Giants 300 Report]
Over the past 15 months, Acting GSA Administrator Dan Tangherlini has done a creditable job of restoring the agency’s standing with Congress and the public.