Stantec, a global leader in sustainable design and engineering, has signed an agreement to acquire Environmental Systems Design, Inc. (ESD), a 270-person engineering firm headquartered in Chicago. Founded in 1967, ESD has built a reputation for excellence and innovation in high-performance design with a roster of industry-leading clients. The terms of the transaction are not disclosed.
The acquisition of ESD significantly deepens Stantec’s expertise in mission critical facilities and data center design. Mission critical facilities represent a rapidly growing segment of purpose-built infrastructure that require an increased level of reliability. These facilities—spanning nearly every major industry—are designed to maintain building infrastructure, emergency dispatch, data storage, or other critical functions in the face of inclement weather and utility outages. Data centers, such as hyperscale facilities, require special, resilient design considerations developed by uniquely qualified teams with regular exposure to the evolving needs of large-scale companies.
The acquisition of ESD expands Stantec’s mechanical, electrical, and plumbing (MEP) and structural engineering practice by 40 percent in the US. These added resources significantly deepen the firm’s smart building engineering capabilities that support the workplace of the future and the emerging trends of decarbonization, building repositioning, and adaptive reuse.
“Merging talent with ESD positions Stantec as one of the top integrated design firms in the US market,” said Leonard Castro, executive vice president and business operating unit leader for Buildings at Stantec. “Our expanded services in data center, smart building design, and high-performance buildings will offer our clients the flexible and stable facilities that meet their operational needs into the future.”
“Stantec is a top-tier firm that shares our vision to improve society through the built environment,” said Raj Gupta, executive chairman at ESD. “ESD has increased the depth and breadth of its services in recent years. Joining Stantec expands our offering globally and creates exceptional career growth opportunities for our employees.”
Critical Project Experience
ESD provides data center design services for several industry-leading technology clients. ESD was recently retained by a confidential client to provide peer review and hyperscale data center design services and subsequently engaged in multiple hyperscale data centers on its behalf across the US. Hyperscale campus developments scale from a single 500,000 square foot (20 to 30 megawatts capacity) facility to multiple facilities spanning several million square feet (300+ megawatts capacity). Multiple sites throughout the country share a baseline design with local adaptations and are designed for efficient phased buildouts without interruption to live facilities.
Additional projects in ESD’s portfolio include
- MEP and mission critical engineering for the United Airlines Network Operations Center in Chicago, a vital component of the airline’s day-to-day operations. Building Information Modeling (BIM) was used to route new systems through the existing structure and around existing systems. ESD worked closely with the City of Chicago and provided specialized consulting services in the areas of electrical and fire alarm codes to provide a unique furniture wiring design that met all of United’s needs.
- MEP and fire protection engineering for the 1,400,000-square-foot expansion of the Las Vegas Convention Center, one of the largest convention centers in the world. The new West Hall includes 600,000 square feet of flexible exhibition spaces with multiple infrastructure services including a variety of electrical power voltages and capacities, telecommunications, water and drainage, and natural gas. Ancillary program and support spaces include a concourse, meeting rooms, lobbies, and café/kitchen space.
- MEP and fire protection engineering and energy modeling for Northwestern Medicine Lake Forest Hospital in Illinois. The 201-bed hospital was designed to meet future demand and modeled to achieve LEED Silver Certification. Energy conservation measures included optimizing the thermal performance of the façade while balancing the solar heat gain of the glass, external shading techniques, LED lighting, and more. ESD also reduced water-fixture use by 20 percent and domestic hot water usage by 26 percent.
Stantec has three existing offices in Chicago, for a total of five in Illinois. With a large concentration of employees in Chicago, ESD also has offices in New York City, San Francisco, and Phoenix. The acquisition will grow Stantec’s presence in Chicago to nearly 600 and to more than 2,050 in the broader US North Central region, which covers 12 states.
The acquisition is expected to close on June 30, 2023.
Related Stories
K-12 Schools | Apr 10, 2024
Surprise, surprise: Students excel in modernized K-12 school buildings
Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction?
Cultural Facilities | Apr 8, 2024
Multipurpose sports facility will be first completed building at Obama Presidential Center
When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.
Green | Apr 8, 2024
LEED v5 released for public comment
The U.S. Green Building Council (USGBC) has opened the first public comment period for the first draft of LEED v5. The new version of the LEED green building rating system will drive deep decarbonization, quality of life improvements, and ecological conservation and restoration, USGBC says.
Codes and Standards | Apr 8, 2024
Boston’s plans to hold back rising seawater stall amid real estate slowdown
Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.
Retail Centers | Apr 4, 2024
Retail design trends: Consumers are looking for wellness in where they shop
Consumers are making lifestyle choices with wellness in mind, which ignites in them a feeling of purpose and a sense of motivation. That’s the conclusion that the architecture and design firm MG2 draws from a survey of 1,182 U.S. adult consumers the firm conducted last December about retail design and what consumers want in healthier shopping experiences.
Healthcare Facilities | Apr 3, 2024
Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion
A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.
Office Buildings | Apr 2, 2024
SOM designs pleated façade for Star River Headquarters for optimal daylighting and views
In Guangzhou, China, Skidmore, Owings & Merrill (SOM) has designed the recently completed Star River Headquarters to minimize embodied carbon, reduce energy consumption, and create a healthy work environment. The 48-story tower is located in the business district on Guangzhou’s Pazhou Island.
K-12 Schools | Apr 1, 2024
High school includes YMCA to share facilities and connect with the broader community
In Omaha, Neb., a public high school and a YMCA come together in one facility, connecting the school with the broader community. The 285,000-sf Westview High School, programmed and designed by the team of Perkins&Will and architect of record BCDM Architects, has its own athletic facilities but shares a pool, weight room, and more with the 30,000-sf YMCA.
Market Data | Apr 1, 2024
Nonresidential construction spending dips 1.0% in February, reaches $1.179 trillion
National nonresidential construction spending declined 1.0% in February, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.179 trillion.
Affordable Housing | Apr 1, 2024
Biden Administration considers ways to influence local housing regulations
The Biden Administration is considering how to spur more affordable housing construction with strategies to influence reform of local housing regulations.