Houston, Texas -- Stone Construction LLC, a design-build construction firm focused on mid – large sized commercial construction projects for owner-occupied industrial facilities, has acquired Harden Constructors, Inc. The two companies have merged their full-service project design and construction capabilities to assist owners of office, industrial, manufacturing, warehouse, retail, educational and religious facilities, and developers of such facilities in prime office parks.
“We are thrilled to add the expertise of Harden Constructors to our offerings. They too have specialized in custom, top quality projects and both of our companies share a long history of giving owners and developer’s single-source design and construction services,” said Chris Hotze, President of Stone Construction. “Our focus is design-build projects where we are the single entity working to afford our clients maximum design and cost efficiencies. Harden Constructors mirrored our approach and is well known for its personalized service and a full range of strengths in constructing more than 1.5 million square feet of commercial space.”
Stone Construction is one of the few companies to utilize computerized building information model (BIM) technology at the start of each project as the foundation of a pre-construction collaboration with clients, removing the guesswork by identifying problems early rather than at the jobsite. As part of Stone’s Streamlined Structural Process™ (SSP), BIM allows for structural conflicts, aesthetic challenges, and mechanical interaction to be identified and resolved before construction, saving time and money for clients. Stone’s leading engineering, design, LEED-certified and BIM experts are adept at responding to customer requests and are able to evaluate needs and application of each unique situation.
“For over 20 years Harden Constructors has focused on building a team of specialists with experience in planning, design and construction, and by joining Stone Construction we will further leverage our capabilities,” added Harden Constructors President Garry Harden. “Our specialties like concrete tilt-wall construction works in tandem with Stone Construction’s BIM design capabilities to deliver turnkey projects customized to individual clients.”
Both companies have undertaken commercial construction projects for a diverse client base including: Builders First Source, Daniel Industries, Dominican Sisters, Exxon, Fisher Scientific, Guaranty Bank, ITT, Kroger, LD Brinkman, Rice University, Siemens, Supa Doors, Inc., The U.S. Department of Energy, Triten Corporation, and W.R. Grace.
When combined with the 35-plus years of construction industry experience represented by Garry Harden and the Harden Constructors team, Stone Construction’s unique core competencies provide exceptional value in the Houston owner-occupied commercial and industrial construction market.
Related Stories
| Nov 2, 2010
A Look Back at the Navy’s First LEED Gold
Building Design+Construction takes a retrospective tour of a pace-setting LEED project.
| Nov 2, 2010
Wind Power, Windy City-style
Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.