Kaohsiung Stadium, the main venue of the 2009 World Games, made its spectacular debut in July 2009. Designed by Toyo Ito & Associates, one of the top architects in Japan, and Ricky Liu & Associates from Taiwan, the stadium can hold 45,000 spectators.
In addition to its eye-catching, horseshoe-shaped appearance, the building is the first stadium in the world powered by solar energy, and has been awarded the “Green Building Certification” by the Taiwan authorities.
Search for an effective panel fixing solution
In order to maximize the natural daylight, 8,844 solar panels were strategically mounted around the roof of the stadium. The solar panels generate more than one million kilowatt-hours of electricity per year, which supports approximately 80 percent of the stadium’s energy needs. To achieve this success, architects and contractors needed to resolve a series of technical issues related to the built-in panels. The job required an effective panel fixing design with optimum energy transfer rate, plus excellent thermal and weathertight performance.
Four-sided structural sealant glazing saves the day
Dow Corning was consulted from the very beginning of the project, and ultimately recommended using four-sided structural sealant glazing to bond the glass solar panels to aluminum sub-frame. This approach maximizes the daylight exposure and hence the generation of clean solar energy by the solar modules. Each unit of the roof façade system has three glass panels, including two solar glass panels (containing solar cell and low-iron glass panels) and one blue tinted tempered glass pane. Dow Corning 983 Structural Glazing Sealant was used for bonding the solar panels and weatherproofing.
Key Participants
Construction Office, Public Works Bureau, Kaohsiung City Government
Toyo Ito & Associates
Ricky Liu & Associates
Fu Tsu Construction
Delta Electronics Inc.
Dow Corning - Silicone Sealant ProviderProducts
Dow Corning 983 Structural Glazing Sealant
With the proven, silicone-bonding technology, the structural silicone not only helps this horseshoe-shaped solar roof building withstand earthquakes, acid rain, typhoons, humidity and extreme heat and UV radiation, but also improves its thermal and acoustic performance by continuous and effective sealing the facade. Dow Corning provides a complete solution, including high performance sealants and professional technical support, which ensures correct sealant application and long-term performance.
Leading the way for more BIPV success
The Kaohsiung World Games Main Stadium was the first 4-sided structurally glazed BIPV (Building Integrated Photovoltaic) roofing project that Dow Corning participated in Greater China. It is one of the largest BIPV projects in Greater China. Dow Corning silicone structural sealants allow creativity and design freedom, combined with lower life-cycle cost and improved thermal and acoustic performance of the facade. Dow Corning structural glazing sealants are now widely used in major BIPV facades in China, including the 2010 World Expo China, National Pavilion and Theme Pavilion.
Click here to view a short animated presentation about how Dow Corning solutions and support helped to create this revolutionary solar-powered stadium.
Or, to learn more about the Dow Corning products featured in this case study, as well as our many other proven materials for the construction industry, please click here. To speak to your nearest Dow Corning representative, visit dowcorning.com/ContactUs. +
Related Stories
| Aug 11, 2010
Florida mixed-use complex includes retail, residential
The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...
| Aug 11, 2010
Restoration gives new life to New Formalism icon
The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.
| Aug 11, 2010
Best AEC Firms to Work For
2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.
| Aug 11, 2010
High-Performance Workplaces
Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.
| Aug 11, 2010
Great Solutions: Business Management
22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
AIA Course: Historic Masonry — Restoration and Renovation
Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.
| Aug 11, 2010
BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey
The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...
| Aug 11, 2010
World's tallest all-wood residential structure opens in London
At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.