flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Leading construction management firm overseeing one of first healthcare projects in the country to utilize innovative IPD process.


By By BD+C Staff | January 31, 2012
For the Cancer Center project, the IPD method will consist of a contractual arrangement between Lawrence & Memorial Hospital, Su

Suffolk Construction was recently awarded Lawrence & Memorial Hospital’s Cancer Center project in Waterford, Conn. The $34.5 million Cancer Center will feature new construction of a 47,000 square-foot comprehensive facility that will include extensive radiation and medical oncology programs, along with state-of-the-art treatment technologies. The project is notable because it will be one of the first healthcare construction projects in the country to utilize the innovative Integrated Project Delivery (IPD) method.

For the Cancer Center project, the IPD method will consist of a contractual arrangement between Lawrence & Memorial Hospital, Suffolk Construction, and the architecture firm, TRO Jung|Brannen. The contract will require that all risk and reward on the project be shared with all project stakeholders, including mechanical/plumbing/controls, electrical, and sitework contractors. The origin of IPD is aligned with Suffolk’s proactive, collaborative approach to managing construction projects. 

Suffolk will also leverage lean design and construction techniques and Building Information Modeling (BIM) to minimize issues during construction, enhance team-wide collaboration, and add significant overall value on the project. In conjunction with Lawrence & Memorial Hospital, the project team will utilize the Production Preparation Process (3P) lean design approach and pull planning tools to allow for more decision making and knowledge sharing early in the planning process. Pull planning will enable the team to improve the flow of the project schedule, increase efficiency, and reduce waste.

Construction of the Cancer Center—which signifies Suffolk’s first project with Lawrence & Memorial Hospital—will begin in spring 2012. The grand opening is scheduled for September 2013. The Cancer Center project is part of Lawrence& Memorial Hospital’s master facility plan and will feature a sustainable design strategy to achieve LEED Silver certification. BD+C

Related Stories

| Oct 13, 2010

Campus building gives students a taste of the business world

William R. Hough Hall is the new home of the Warrington College of Business Administration at the University of Florida in Gainesville. The $17.6 million, 70,000-sf building gives students access to the latest technology, including a lab that simulates the stock exchange.

| Oct 13, 2010

Science building supports enrollment increases

The new Kluge-Moses Science Building at Piedmont Virginia Community College, in Charlottesville, is part of a campus update designed and managed by the Lukmire Partnership. The 34,000-sf building is designed to be both a focal point of the college and a recruitment mechanism to get more students enrolling in healthcare programs.

| Oct 13, 2010

Cancer hospital plans fifth treatment center

Construction is set to start in December on the new Cancer Treatment Centers of America’s $55 million hospital in Newnan, Ga. The 225,000-sf facility will have 25 universal inpatient beds, two linear accelerator vaults, an HDR/Brachy therapy vault, and a radiology and imaging unit.

| Oct 13, 2010

Apartment complex will offer affordable green housing

Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.

| Oct 13, 2010

Residences bring students, faculty together in the Middle East

A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.

| Oct 13, 2010

HQ renovations aim for modern look

Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.

| Oct 13, 2010

New health center to focus on education and awareness

Construction is getting pumped up at the new Anschutz Health and Wellness Center at the University of Colorado, Denver. The four-story, 94,000-sf building will focus on healthy lifestyles and disease prevention.

| Oct 13, 2010

Community center under way in NYC seeks LEED Platinum

A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.

| Oct 13, 2010

Community college plans new campus building

Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.

| Oct 13, 2010

Bookworms in Silver Spring getting new library

The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021