flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design+Build selected as GC for Chicago recon project

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.


By By BD+C Staff | December 19, 2011
Summit Design + Build, LLC recently announced the firms selection as general contractor for 1313 W. Randolph Street, the conver

Summit Design + Build, LLC recently announced the firm’s selection as general contractor for 1313 W. Randolph Street, the conversion of a historic industrial loft building into a mixed-use facility, in Chicago’s West Loop.

AP MCG Randolph Investors LLC is the owner/developer of the project.

The 130,000 square foot building, which was completed in 1927 and was home to the Wholesale Florist Exchange, is being completely renovated and will feature 70 unique loft-style apartments with Italian-style kitchens, modern finishes and polished concrete floors; approximately 27,000 square feet of ground floor retail; a lower level parking garage; and a fourth floor common amenity space. 

The exterior of the building which features distinctive cast-in-place concrete facades decorated with Art Deco-style floral motifs and prominent ribbed concrete piers will remain intact and the ground level storefronts will utilize the original building openings.  

Summit Design + Build’s Mark Heffron, senior project manager, Bryana Yergler, project engineer II, and John Marosi, superintendent, will be responsible for the on-site construction of 1313 W. Randolph Street.

Hartshorne Plunkard Architecture is the project architect.  Completion is scheduled for third quarter 2012. BD+C

Related Stories

| Jan 11, 2012

Mortenson starts construction of Rim Rock Wind Project

Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.

| Jan 9, 2012

FGM Architects acquires SRBL Architects

The firm reviewed gaps in each of the markets and identified a need in the municipal market for stronger police facility design expertise as well as additional project management and design expertise for this market.

| Jan 9, 2012

Shawmut appoints Les Hiscoe COO and EVP

In his new role, Hiscoe will focus on developing the Company’s field services divisions; national business in retail, hospitality, gaming, and sports venues; Tri-State business in academic and healthcare; sales and marketing; and human resources

| Jan 9, 2012

Thornton Tomasetti acquires green consulting firm Fore Solutions

International engineering firm launches new building sustainability practice.

| Jan 9, 2012

METALCON International 2012 announced

METALCON 2012 is scheduled for Oct. 9-11 at the Donald E Stephens Convention Center, Hall A, Rosemont, Ill.

| Jan 9, 2012

Lutron appoints Pessina president

In his 35-year career with Lutron, Pessina has acquired broad experience in the engineering, quality assurance and manufacturing areas. 

| Jan 9, 2012

A new journey for KSS Architects co-founder

Kehrt's legacy of projects include Rutgers University's Biomedical Engineering Building, the renovation and expansion of Cornell University School of Hotel Administration, the recent new campus center at The Richard Stockton College of New Jersey and Princeton Township's Municipal Complex. 

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 8, 2012

WHR Architects promotes Joel Colwell, AIA, to principal

With over 30 years of experience, Colwell has managed large-scale, complex projects for major healthcare systems as well as challenging smaller renovations and additions — all with notable success.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021